The Oceanside Experimental Sand Bypass?The Next Step
Following the completion and successful operation of the first phase of the Oceanside Sand Bypass, the next step in the development of the experiment has begun. The Phase I plant is not...
Computer Simulation Modeling of Ebb-Tidal Deltas
An ebb-tidal delta simulation model has been developed incorporating gross features of delta and channel morphologies which can be measured from vertical aerial photographs. Delta and...
Thoughts on Large Scale Coastal Behavior
Large scale coastal behaviour (LSCB) deals with the development of coastal profiles and sediment budgets of a large coastal stretch (order tens of km's) over a considerable...
New Dredging Technology for Inlets and Beaches: Move Sand to the Pump
Conventional dredging for channel maintenance and 'mining' of offshore sand for beach restoration and renourishment 'moves the pump to the sand'....
Dredge Spoil and Inner Shelf Investigations off Tauranga Harbour, Bay of Plenty, New Zealand
Dispersion of dredge spoil from an inner shelf dump-mound in 11-17 m water depth, 3 km offshore from Tauranga Harbour, Bay of Plenty, New Zealand, was investigated as part of environmental...
Higher Frequency Acoustic Measurements of Coarse Bedload Transport
Although sensors have been developed which provide high temporal resolution for the measurement of wave profiles, flow fields and suspended sediment concentrations within the coastal system,...
Standing Wave Measurements of Bedload Thickness: Feasibility in an Air System with Model Sediment
A novel technique would yield information about bedload thickness from measurements of a standing wave pattern produced by a sound source insonifying the bottom at normal incidence. The...
Navy Targets Effective Infiltration/Inflow Elimination
The Naval Facilities Engineering Command (NAVFAC), Chesapeake Division, retained the services of RJN Environmental Associates, Inc. to perform a Sanitary Sewer Evaluation Survey (SSES)....
Constructed Wetlands at Mesquite, Nevada
Subsurface flow (SF) wetlands are used to provide effluent polishing following treatment in an aerated lagoon at Mesquite, Nevada. General SF wetland design methodology is discussed in...
Influence of Hydrodynamics on Biofilm Accumulation
The influence of hydrodynamics on biofilm thickness was investigated under laminar and turbulent flow conditions. The maximum biofilm thickness was found within the transition region between...
The Impact of Drought on Hydropower Generation-Case Study of Bureau of Reclamation Hydropower Plant
The paper explores the effects of extended drought on power generation at Shasta hydropower plant, a Bureau of Reclamation facility in Northern California. Statistical measures of water...
Economic Evaluation of Minimum Flow at Rockton
The Rockton Hydroelectric Project is a two-unit, 1,100 kW plant operated by South Beloit Water, Gas & Electric Company, a wholly owned subsidiary of Wisconsin Power & Light...
Improving the Assessment of Instream Flow Needs for Fish Populations
Instream flow requirements are one of the most frequent and most costly environmental issues that must be addressed in developing hydroelectric projects. Existing assessment methods for...
Techniques for Balancing Instream Flow Needs with Project Operation
Balancing power and non-power benefits of hydroelectric developments has become a controversial issue in the relicensing of projects. Multiple project and multiple objective flow management...
The Use of IFIM for Evaluating Effects of a Flow Alternative on Fish Habitat in a River System with Competing Water Demands
The Instream Flow Incremental Methodology (IFIM) was used to evaluate instream fish habitat in the Platte River in central Nebraska. The IFIM analysis presented herein incorporates 1)...
Evaluation of Alternatives for Providing Minimum Flows Below TVA's South Holston Dam
TVA is in the initial phases of a project to provide minimum flows in the South Fork Holston River below South Holston Dam. The purposes of the minimum flows at South Holston are to enhance...
A Water Budget Approach to Instream Flow Maintenance
Storage reallocation is a current issue at many Federal water storage facilities that have hydroelectric generation. Allocation of storage to support instream flows is one of the changes...
Instream Flow Needs Below Peaking Hydroelectric Projects
A method has been developed to assist in the determination of instream flow needs below hydroelectric projects operated in a peaking mode. Peaking hydroelectric projects significantly...
Small and Low Head Pumped Storage Projects
With the recent completion of several very large pumped storage projects, the perception of a hydroelectric pumped storage project in some power industry circles may be that of a project...
A Flow Forecasting System for Hydro Power
The flow forecasting system comprises a network of meteorological stations, a weather forecasting model, and a watershed hydrologic model, implemented in a microcomputer. The meteorological...
Return to search