Feasibility, Licensing and Design: Bradley Lake Hydroelectric Project
This paper describes the licensing, environmental, engineering, and design aspects of the project. Due to the project's remote location and geological setting, the paper will...

Development of High Specific Speed Pump-Turbines
The operational range of pump-turbines is continually increasing, especially in the direction of high specific speed installation. In this context, high specific speed refers to units...

Update: Ozark-Webbers Falls Turbines
The Ozark and Webbers Falls powerhouses were designed and constructed under the supervision of the U.S. Army Corps of Engineers. Both are located on the McClellan-Kerr Arkansas River Navigation...

Murray?Commissioning Maxi Hydro with Mini Flow
The Murray Hydroelectric Project contains two of the largest pit turbines in the world. An existing dam constructed for navigation and flood control on the Arkansas River, Lock and Dam...

Planning and Operation of Hydropower Development on a Navigation System, a Case Study
This paper examines the steps taken to optimally develop the hydropower plant at Lock and Dam No. 13 on the Arkansas River as part of an existing multiple use system. The specific items...

Harnessing the Allegheny: Four Low-Head Projects
The navigable portion of the river, extending northeast of Pittsburgh approximately sixty miles, contains eight lock and dam systems under the jurisdiction of the U.S. Army Corps of Engineers...

Siphon Penstock Installations at Hydroelectric Projects: A Survey of Design, Construction and Operating Experience
There can be advantages to using siphon penstocks at small hydro projects, particularly those constructed at existing dams. One problem, however, is a lack of documentation of siphon penstock...

Paradise River, a Challenging Small Hydro Development
The frequent assumption that small hydro developments are simple is not always borne out in practice. A case in point is the Paradise River Development in Newfoundland, Canada. This paper...

Pumping System Permits Diversion of Water River Dam
For project construction at an existing Corps of Engineers' dam in New Mexico, where modifications to the existing outlet works were performed, a barge-mounted pumping system...

Buffalo Bill Dam Modifications?Modification of an Existing Bureau of Reclamation Facility to Increase Power Generation
This paper describes a joint venture between the United States Bureau of Reclamation and the State of Wyoming to increase the storage capacity and power generation capacity of Buffalo...

Analyses of the Lower San Fernando Dam Failure
The main methods employed for the back analysis of the behaviour of the Lower San Fernando Dam during the 1971 earthquake are described. The requirements for a comprehensive analysis are...

Analysis of Concrete Gravity Dams Using Microcomputers
Monenco Consultants Limited has developed a microcomputer program entitled 'DS2' for the stability analysis of concrete gravity dams. This paper discusses this...

Evaluating Uplift Pressures for Concrete Gravity Dams
An approach for evaluating uplift and dam foundation conditions, which resulted from the initial phases of an Electric Power Research Institute (EPRI) study is presented. An earlier study...

Tarbella?Third Extension Project Units 11 to 14: 440 MW Francis Turbine Design
At Tarbela Dam in northern Pakistan, the Third Extension Project, units 11 to 14 of 440 MW each, is presently under construction. When completed in 1992, the multipurpose hydro-irrigation...

Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....

Hydro on Hold
Hydropower projects have become the target of a growing environmental movement overseas. The tradeoff between clean, renewable energy and the possible environmental impacts of the reservoirs...

Quick Response on the Mississippi
In November 1987, the Mississippi River broke through the foundation of the St. Anthony Fall's Lower Dam Hydropower Plant. The plant's owner, the Northern State...

Guidelines for Failure Investigation
The Guidelines for Failure Investigation by the Task Committee on Guidelines for Failure Investigations of the Technical Council on Forensic...

Cautious Risk Taking
Traditionally, the design engineer could bear virtually unlimited liability for design failure. Now he is less vulnerable. The concept is less than 20 years old, but since the early 70s,...

Grouting Trends
The grouting industry is discussed and North American practice compared to European practice. There has been more innovation in this field overseas, but there have also been failures....

 

 

 

 