Design and Operation of a Differential Surge Tank
The differential type of surge tank is more effective in operation than the simple type because it reacts more quickly to load changes of all sizes. The differential tank is also usually...
Hydro Research and Plant Renewal
Obtaining extra energy or output from existing plants is the current topic when the question of refurbishing older turbine installation arises or when plant operating conditions can be...
Development of Three Systems Operated Rev. Pump Turbine
In order to represent the development of reversible, single stage pump turbines in Yugoslavia, the three systems operated pump turbine (3SRPT) of the fourth unit of Moste hydro power plant,...
Fire Protection at the Grand Coulee Hydro Project
In the fall of 1980 a rupture of one of the Project's 525kV transmission cables occurred and created a fire. Power from three Third Powerplant 700MW units was interrupted,...
Generator/Motors and Adjustable-Speed Drives for Waddell Pumped-Storage Plant
This paper describes the pumping and generating units and associated electrical equipment planned for Waddell Pumped-Storage Plant. Waddell Pumped-Storage Plant is to be located near Phoenix,...
Electrical Equipment for Pumped Storage Plants
Selection of generator/motors and other electrical equipment for pumped storage plants requires consideration significantly different than for conventional hydro plants. This is particularly...
Roller Compacted Concrete Mix Design for Pamo Dam
Pamo Dam is designed as a 265 foot (81M) high gravity dam that will be located on the Santa Isabel Creek in San Diego County, California. RCC volume will be approximately 491,000 cubic...
RCC Pavement Construction and Quality Control
In October 1986 a 16,500 sq yd (14,300 sq m) roller-compacted concrete (RCC) pavement tank hardstand, the first of its kind in Europe, was built for the U. S. Army at Harvey Barracks in...
Extent of Water Quality Effects of Dams?A National Viewpoint
An overview of phosphorus impacts on impoundments, a subset of the contents of the Dam Water Quality Report is presented. The U.S. Environmental Protection Agency (EPA) is the lead investigator...
Reservoir Safe Yield Evaluation Using Simulation
The safe yield available from surface water impoundments serving the City of Portsmouth, Virginia, was evaluated, and the sensitivity of the reservoir system to several factors was investigated....
Risk Consideration in Water Supply Reservoir Capacity Design
This study develops a method for estimating the risk in reservoir capacity design by applying frequency analysis to the mass curve method. It provides a means for the engineer to use familiar...
Water Assurance Districts: A New Concept in Local Government
Society has long utilized local governmental units to implement numerous water management functions. This paper discusses a new and relatively unique local organizational structure now...
Artificial Recharge: Key to Scottsdale's Future
The City of Scottsdale, Arizona has begun planning its strategy for meeting its future needs by recognizing artificial recharge, subsurface storage, and recovery as an integral component...
Underground Storage in Urban Stormwater Management
The use of underground pipe detention basins is discussed. These basins mitigate the frequency of localized flooding and sewer surcharging by effectively increasing the flow capacity of...
Computer Based Master Plans Manage Water Resources
Scottsdale is pursuing water and wastewater master planning with the goal of implementing a proactive water resources management policy. To prepare dynamic master plans with the above...
A Study in Nuclear Decommissioning
The Gentilly-1 nuclear power plant two year decommissioning project launched a series of firsts for the nuclear power industry. It was the first commercial sized plant in the world to...
Injecting an Oxygen Fix
Seasonal dissolved oxygen deficiencies are an old problem in hydropower discharges from deep impoundments. At the Richard B. Russell Dam near Savannah, Georgia, an innovative solution...
The `Down' of Top Down
The 800-space parking area for the Milwaukee Center was built in a four story deep basement of the building. In order to excavate the area without damaging two adjacent historic structures,...
Underground Storage Tank Program and Its Implications
National concern over leaking underground tanks storing hazardous materials and wastes has resulted in the implementation of the 1984 Amendments of RCRA, which include the requirement...
Space Age Pueblo
If and when 8 million passengers decide to fly in and out of Albuquerque, N.M. in one year, the renovated and expanded airport will be ready for them. In a comprehensive $120 million project,...
Return to search