Bibliography of Steel Columns
This book, which was prepared by the Committee on Compression Members of the Structural Division of the American Society of Civil Engineers, attempts to provide a complete bibliography...
Grouting Slip Liners: The New Inside Story
There are approximately 800,000 miles of water and sewer pipelines in the U.S. that need remedial work. About 2% need work each year, usually due to normal or accidental corrosion. Normal...
Seattle Swing
The swing bridge has long been out of favor in the U.S. because of the navigational hazard presented by mid-channel pivot piers. A consortium of engineers is updating the design to a state-of-the-art...
Replacing Bridge Decks
U.S. bridges last an average of 68 years, their decks 35 years. But few bridges have been built with provisions for future deck repair, the only criterion being lowest first cost. During...
Building Blocks for the Future
In the near term, advanced, conventional materials�namely higher-strength steel and concrete�will dominate infrastructure rehab. New steels of higher strengths and toughness are increasingly...
Future Freight
In 21st-century America, most long-distance cargo will be transported via pipelines linking major cities. The most versatile freight pipeline is the capsule variety, which carries cargo...
Designing in Circles
Round buildings are a popular�but sometimes expensively perceived�design choice. With careful engineering and planning, they can offer a creative, cost-competitive option. They add another...
Aussie Steel
The 50-story Chifley Square Building being built in Sydney will be the tallest Australian steel building. Scheduled for completion in June 1992 at a cost of $310 million, it will house...
Rebuilding Philadelphia's El
In reconstructing an urban transit system, the challenge in Philadelphia was to do it without disrupting peak hour commuter traffic or disturbing activities on the street and sidewalks...
Haunches and Hangers
The $210 million VA Medical Center at Houston features a structural system as innovative for the 1990s as the interstitial space concept was in the 1960s. The medical center, designed...
Expressway Centerpiece
The center span of the Napoleon Bonaparte Broward Bridge, better known as the Dame Point Bridge over the St. Johns River at Jacksonville, Fla., is the country's longest cable...
Cables and Flexible Pipes in Contact with Sea Floor
Flexible offshore systems can be analyzed by a number of different techniques. The techniques described herein fall in the general category of finite element methods. Special cable elements...
An Overview of Structural Reliability Methods
Recent developments in structural reliability theory and better availability of load and strength data suggest that reliability-based design (RBD) methods should be considered as a practical...
Transmission Line Structure Loading
This paper outlines specific procedures for determining loads on transmission line structure systems that can be used in the reliability based design or assessment of components of these...
Improved Techniques for Assessing Structures
The Electric Power Research Institute (EPRI) has specially designed and equipped the tower testing station located within their Transmission Line Mechanical Research Center (TLMRC) near...
Cambering of Steel Beams
Cold cambering with force in the fabrication shop is an effective and economical method of compensating for deflections of composite beams. Typical beams should be cambered for dead load...
Effects of Fabrication on Local Stress Conditions
Factors connected with fabrication that impact on the behavior of structural steel members are reviewed. Residual stresses that result from basic steel production and subsequent fabrication...
Effect of Imperfections on Structural Performance
This paper briefly describes the effect of initial crookedness and residual stress on the behavior of steel members. Both imperfections are unavoidable consequences of modern fabrication...
Engineering Design Concerns Regarding Steel Fabrication
The precise fabrication of structural steel pieces is an essential part of the process leading to the satisfactory erection and connection of the individual steel elements into the final...
Repair and Rehabilitation of Damaged Steel Flexural Members
In earlier years, the primary method for repairing steel flexural members was to replace the member. However, with the cost of labor and material increasing dramatically over the last...
Return to search