Addressing Central Valley Project Policy Issues Using a General-Purpose Model
The U.S. Bureau of Reclamation's Central Valley Project (CVP) in California is constantly undergoing changes in legal mandates and policy objectives. Due to the complex nature of existing...

Joint Optimization of Groundwater Remediation and Monitoring
We describe the challenge of devising optimization methods which optimize jointly the remediation and monitoring at a contaminated site. We refer to the dual control method as a promising...

Water and Wildlife Enhancement with Land Retirement
This case analysis compares costs of land retirement and current on-going structural improvements for salinity reduction in the Colorado River. Results suggest land retirement programs...

Wetland Loss Rates and Agricultural Drainage
The current paper uses National Resources Inventory data to document the relation between private on-farm agricultural drainage investment activity and wetlands loss. The paper presents...

Hydrodiplomacy on Forester Creek
The goal of this paper is to share information regarding political battles confronting the engineer with regards to drainage issues and concerns. Very often drainage boundaries do not...

Integration of Water Rights and Network Flow Modeling in the Upper Snake River Basin
The U.S. Bureau of Reclamation's Pacific Northwest Region and Denver Office are working to enhance the ability to integrate hydrological and institutional modeling capabilities for use...

PROSIM - A Water Rights-Based Operational Simulation Model of the Provo River
The development and initial application of a computer model of the hydrology, water rights, and operation of the Provo and Weber rivers in Utah are described. The new FORTRAN model PROSIM...

Decision Support System for Conjunctive Use Under Complex Water Right Conditions
A prototype microcomputer based decision support system (DSS) is presented for assisting in the conjunctive use management of surface and groundwater under the water rights doctrine of...

Improving Reservoir System Operations Under Water Rights Requirements
Successful reservoir operations planning largely depends on knowing the future inflow to the system; understanding the objectives of the reservoir system; and understanding the relationship...

Evaluation of the Water Supply Potential of the Floridian Aquifer in Seminole County, Florida
In Seminole County, Florida, a occurred in the 1980s and early 1990s due to a large influx of residents. This large increase in demand, when coupled with a limited groundwater supply,...

Predicting Hydrologic Impacts of a Severe and Sustained Drought on the Colorado River Basin
We investigated the impacts of a severe and sustained drought (SSD) on the hydrology of the Colorado River Basin. The simulation was carried out using the Colorado River Network (CORN)...

A Gaming Analysis of Drought-Coping Policy Options
Eight persons, representing the seven Colorado River Basin state and the Secretary of the Interior, managed a severe, sustained drought in the basin. The drought was portrayed by a simulation...

Economic Impacts of Severe and Sustained Drought
A hydrologic-economic-legal impact model shows that a severe and sustained drought in the Colorado River Basin would cause acute economic damages to most instream water users, and to upper...

The Law of the Colorado River: Can It Cope With Severe Sustained Drought?
This paper analyzes the Law of the River from the perspective of its effect on allocation decisions in the event of a long term, severe drought. The analysis is organized in a manner familiar...

Missouri River Economic Impacts Model
The Missouri River basin recently (1987-1992) experienced a drought that affected project uses and environmental resources. This drought and the need to address changes that have occurred...

Stochastic Optimal Control for Determination of Freshwater Inflows to Estuaries
The objective of the research is to develop estuarine system management models based upon discrete-time stochastic optimal control. An analytical feedback control law is given. The control...

Differential Dynamic Programming for Estuarine Management
Differential dynamic programming (DDP) is applied to solve the estuarine management problem to determine the optimal amount of freshwater inflows into bays and estuaries in order to maximize...

Missouri River Master Manual Review and Update
The Missouri River Master Water Control Manual (Master Manual) presents the basic water control plan and objectives for the integrated operation of the six mainstem reservoirs in conjunction...

Development and Application of Long Range Study (LRS) Model for Missouri River System
The Long Range Study (LRS) Model is a simulation model developed in the 1960's develop and test criteria for operation of the Missouri River mainstem reservoirs through an extended period...

Missouri River Recreation Economic Analysis
The Missouri River main stem lakes and downstream river reaches encompass about 1900 river miles from the mouth at St. Louis, Missouri, to the headwaters of Fort Peck Lake in Montana....

 

 

 

 

Return to search