RCC at 10
Tens years after the first roller-compacted concrete (RCC) dam in the U.S.�the 169 ft high Willow Creek Dam in Oregon�was completed, the method has gained wide acceptance around the world...
Smart Structures
Detecting cracks in concrete before they become visible could help prevent structural collapse of buildings and other civil works, say professors at three schools of engineering. The University...
Instrumenting the `Y'
Segmental bridges are still relatively new to the U.S. and questions persist about their design and behavior. To expand the knowledge base, a number of laboratory and field studies have...
Tying Back a Landslide
A slope covered with landslide debris is never the most desirable site on which to build, but sometimes it is the only one available. For the Forks of Butte hydroelectric power project,...
Manholes and Microtunneling
Contractors are for the Oakwood Beach Interceptor Sewer Project, on Staten Island, N.Y., were having difficulty. Glacial tills and a high water table made working 90 ft below the ground...
Pressure Pipeline Design for Water and Wastewater
This committee report,
Cables and Anchorages
The following types of cables are generally used in cable stayed bridges: Parallel bars; Parallel seven wire strands; Parallel or semi-parallel wire cables; Locked coil strands and ropes;...
Rebuilding an Illusion
A dam that controls the level of Fall Lake, a major entry to the Boundary Waters Canoe Area Wilderness of northern Minnesota had to be rebuilt, but federal agents barred constructors from...
Decentralized Wastewater Management
With the discovery earlier this century that city squalor caused disease, we protected ourselves by piping raw wastes away. Later, when the discharge had transformed rivers into foul,...
Under the Undersea World
Soil conditions in New Orleans are generally unfavorable to the construction of large structures, and exceptionally so along the Mississippi River banks, which tend to slide. But that...
Dome Over Orlando
The article describes Orlando's new City Hall, a 267,000 sq ft nine-story reinforced concrete tower, clad in granite-aggregate precast concrete panels and topped by a 120...
Soil-Pipe Interaction During Frost Heaving Around a Buried Chilled Pipeline
The freezing of soil water around a buried chilled pipeline leads to soil heaving, which is affected by the presence of the pipe. This process may eventually cause pipeline failure. The...
Experimental Study of Adfreeze Heaving of Augered Caisson Footings
In order to establish the required depth of augered caisson-type footings in cold regions and their optimal design against adfreeze heaving, an experimental field investigation has been...
Numerical Analysis of Frost Shields
The term 'frost sheilding' has been used to describe the practice of using flat stock rigid insulation materials burial above a water or sewer pipe to reduce...
New Admixtures for Cold Weather Concreting
Chemicals were tested for their ability to promote strength gain in portland cement concrete at low temperature. The admixtures depressed the freezing point of the mix water and accelerated...
High-Performance Concrete in All-Weather Deck Pours
A high-performance concrete mix enhanced with a combination of microsilica, superplasticizer, and high dosages of an corrosion-inhibiting, accelerating admixture (calcium nitrite); proved...
Procedure for Seismic Evaluation and Design of Small Bore Piping
Simplified methods for the seismic design for small bore piping in nuclear power plants have been used for many years. Various pipe designers have developed unique methods to treat the...
Anchoring?A New Generation
During the time period of NRC Bulletin 79-02, and certainly afterwards, the use and application of wedge type anchors in Nuclear Power Plants took on a new perspective. The data gathered...
Recirculation Piping Replacement Project at Dresden Unit 3
This paper discusses the Recirculation Piping Replacement Project performed at Dresden Unit 3 during 1985 and 1986. It describes several of the technical and administrative problems associated...
Interim Spent-Fuel Storage Options at Commercial Nuclear Power Plants
Although spent fuel can be stored safely in waterfilled pools at reactor sites, some utilities may not possess sufficient space for life-of-plant storage capability. In-pool storage capability...
Return to search