Data Acquisition and Control for Hydraulic Models
The Waterways Experiment Station is expanding the use of computer controlled data acquisition and control equipment on a variety of hydraulic models. These systems are presently being...

A Unique Communication System for Aerial Ropeways
The basic principles of operation of a Double Reversible Aerial Tramway are introduced. A brief note is given explaining a safety circuit or survey current used on the haul rope, since...

The Planning of an Automated Rapid Transit System in Vancouver
BC Transit is building a 13 mile (22 km) rapid transit line in Vancouver that incorporates Heavy Rapid Transit, Light Rapid Transit and Automated People Mover concepts. The bus sized lightweight...

Kobe New Transit System Portliner experience of Unmanned Operation
The Kobe New Transit System 'Portliner' is the first automated people mover which achieved the fully automated unmanned operation as a public transportation system...

Cable Propelled People-Movers?An Idea Whose Time Has Come Again
Cable-propelled transportation systems have been in use throughout the world for more than a century. Today, a completely automated cable-propelled transit system has been developed through...

The H-Bahn, a Fully Automatic People Mover System
The H-Bahn suspended cabin system is the contribution of the Siemens - DUEWAG joint development venture towards solving the problem of economical public transportation. This track-bound...

Unique Features of Automated People Mover Systems
This paper identifies the characteristics and unique features of the automated transit system presently being installed in the central business district of Detroit, Michigan. This system...

Human Interface Design of an APM Control Center
The control center of an Automated People Mover (APM) system is a man-machine system. Both software and hardware aspects of the design of the monitor room that directly affect ease of...

Detroit's DPM Maintenance and Control Facility
The Maintenance and Control Facility (MCF), a single building complex for the Detroit Downtown People Mover (DPM) system, incorporates the people mover system's transit vehicle...

Alternative Procedures for Investigating Failures
Failures of engineered structures continue to occur. This is despite rapid advances in engineering theory, new, more sophisticated methods of analysis, and streamlined techniques for preparing...

Failure Information Needs in Civil Engineering
If we are to learn from failures of engineered facilities, failure information must be in a useful form, and it must reach those who can effect improved practice. This paper discusses,...

Ensuring Quality Construction
This paper describes the US Army Corps of Engineers' efforts at procuring quality construction: 1) a three-phase approach (preparatory, initial, follow-up) was developed to...

Avoiding Disputes: The Construction Manager's View
Avoiding and minimizing contract disputes, from the construction manager's (CM) point of view, begins during the preliminary planning and design stages and continues throughout...

Construction Inspection?The Last Line of Defense
Construction inspection, or a quality assurance program, is typically the last line of defense in relation to claims for the constructed project. The quality assurance team should be a...

Construction Cost Control
The second edition of Construction Cost Control, the first revision in thirty-three years, has been updated to provide engineers and contractors...

Making Computerized Project Control Systems Work?Background
Control systems can be considered as consisting of five major elements. These are: establish the objective or standard to be achieved-quality, maximum duration, resource utilization, maximum...

Control of the Design Process
Gilbert/Commonwealth, Inc. (G/C) was the architect-engineer for the original design of the Florida Power Corporation (FPC) Crystal River Nuclear Plant, Unit 3 (CR3) and has been involved...

Computer Management Concepts for Student Engineering
This paper presents many of the principles and concepts being taught to engineers of the future concerning their use of computer related activities. For example, from the cost/risk/benefit...

Automation of Booster Pump Stations
Several techniques have been used to automate booster pump stations for irrigation conveyance systems. These pump stations typically must supply pressurized water for a wide range of flow...

Management of Microcomputers in PennDOT A Perspective on Managing Training
The Pennsylvania Department of Transportation is in the midst of a 63 million dollar 'Plan to Achieve Leading Edge Status in Electronic Data Processing. ' This...

 

 

 

 

Return to search