Foundations and Breakaway Walls of Small Coastal Buildings in Hurricane Hugo
After Hurricane Hugo a survey of damage to small, coastal buildings was conducted in North and South Carolina. The performance of elevated foundations, breakaway walls and foundation cross...
A Conflict Avoidance Methodology for Port Dredging Issues
Port dredging operations have often been the focus of controversy over environmental and funding disputes. This paper asserts that adversarial relationships among interested parties will...
Phased Engineering Development and Multiple Agency Review of Public Safety Issues
Several Santa Barbara County agencies have key engineering review responsibilities for new development. The magnitude of issues raised and the level of engineering review required for...
The Challenge of Meeting New Effluent Guidelines
Meeting new effluent guidelines is presenting a challenge to the environmental engineer. In most cases, existing plants must be retrofitted which will involve options of source treatment,...
Environmentally Sustainable Development: A Concept in Action
Environmentally sustainable development denotes a balanced approach with appropriate consideration for environmental protection. The successes achieved in the development of five diverse...
Constructed Wetlands at Mesquite, Nevada
Subsurface flow (SF) wetlands are used to provide effluent polishing following treatment in an aerated lagoon at Mesquite, Nevada. General SF wetland design methodology is discussed in...
Project Peer Review Guidelines
Breaking Down the Barriers
The structural engineering of multistory buildings is a complex and time-consuming chore, but new design and analysis tools can greatly simplify the task. The article traces the development...
LRFD: Still Waiting
Introduced in 1986, load and resistance factor design (LRFD), has a way to go before it becomes standard practice for steel design. LRFD-based design typically results in savings on gravity...
Using Project Management Techniques in Hydro-Relicensing
To answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company (CMP) has applied the principles of project management,...
Double Radial Gates for the Brunau Ice-Retention Weir in Switzerland
During the springtime thaw, the River Sihl, which flows from the south into the city of Zurich, Switzerland, carries large quantities of ice flow. In 1968, to protect the footings of a...
Development of Hanford Site Lysimeter Facilities
Lysimeters have been constructed at the Hanford Site near Richland, Washington to quantify mechanisms that affect migration of radioactive and hazardous waste in geologic media. The history...
Source of Atrazine and Desethylatrazine in a River, During Base Flow
A budget of atrazine and desethylatrazine loads was computed for a 116-kilometer reach of the Cedar River in Iowa to determine where these compounds enter the river during base-flow conditions....
LISP or CLIPS: Selecting an Expert System Tool in Hydraulic Engineering
The transfer of Artificial Intelligence(AI) technology from the research laboratories to the scientific and engineering environments has been made possible by phenomenal advances in computer...
Sedimentation Aspects of Floodplain Management
This paper presents sedimentation aspects of a recent disastrous flood that occurred during September 10-12 1990 in the Han River basin, a central part of the Korean peninsula. The flood...
The Benefits of U.K. Guidance for Temporary Works
In British contracts the Contractor is responsible for the design and execution of temporary works unless the Design Engineer or the Client expressly instruct how the work is to be undertaken...
Current Legal Issues Impacting Temporary Works in Construction
There are two evolving areas of legal concern to the engineer and contractor involved in any aspect of temporary construction. The interpretation and application of the Occupational Safety...
Limit States Design of Wooden Formwork for Concrete Walls
Load and resistance factors are developed for ultimate limit states design of wooden formwork components for concrete walls when the lateral concrete pressures are computed using the ACI...
FHWA'S Bridge Temporary Works Research Program
The Federal Highway Administration (FHWA) has developed a research program to address bridge falsework design and construction. This resulted from the collapse of the Route 198 bridge...
Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....