Case Study: Steele Creek Dam Safety Analysis, Bristol, Tennessee
Steele Creek Dam creates a small recreational park lake before discharging into Beaver Creek a few hundred yards below the dam. Existing homes and trailers downstream from this junction...

Uplift Pressures and Strengths for Concrete Gravity Dams
This paper presents an overview of the results of a three year study to compile a database of stability parameters and foundation characteristics for older concrete gravity dams. The database...

Cone Penetration Testing: Cost Effective Soil Exploration
On reviewing the 1987 Part 12 Dam Safety Inspection Reports for the Wisconsin River Power Company's Petenwell and Castle Rock Dams, the Federal Energy Regulatory Commission...

The Replacement of Penstocks at TVA Ocoee II Power Plant
The Tennessee Valley Authority (TVA) replaced the steel penstocks at its Ocoee II power plant near Ocoee, Tennessee. A total replacement was necessary because of severe corrosion on the...

Double Radial Gates for the Brunau Ice-Retention Weir in Switzerland
During the springtime thaw, the River Sihl, which flows from the south into the city of Zurich, Switzerland, carries large quantities of ice flow. In 1968, to protect the footings of a...

Raising of King Talal Dam
The King Talal Project is located on the Zarqa River, a Jordan River tributary, in Jordan. An existing embankment dam, 100 m high, built in the mid-seventies by the Jordan Valley Authority...

Penstock Rehabilitation
The deterioration of aging penstocks is a common problem at many existing hydroelectric plants. A comprehensive understanding of the physical condition and functional limitations of an...

The Development and Writing of the ASCE Manual of Practice for Steel Penstocks
The 'Manual of Practice for Steel Penstocks' is being written under the supervision of the Hydropower Committee of the ASCE Energy Division. The committee felt...

Prefabricated Power Plants, Experience and Prospects
This paper presents the prefabrication concept applied to the Greenup (Greenup Locks and Dam, Ohio River, 72 MW, 1982) and the Sydney A. Murray, Jr. (Old River Control Structures, Vidalia,...

Dynamics of Protective Coatings to Limit Cavitation Damage
Cavitation implosions inflict a very high impact stress on turbine blades and turbine liners. One strategy for limiting the impact on the turbine components is to overlay a protective...

Relationship Between Lysimeter Area and Evapotranspiration (ET)
The lysimeter is an important instrument for measuring evapotranspiration (ET) of crops. It is widely used in the irrigation and drainage experimental stations in China. However, the areas...

Source of Atrazine and Desethylatrazine in a River, During Base Flow
A budget of atrazine and desethylatrazine loads was computed for a 116-kilometer reach of the Cedar River in Iowa to determine where these compounds enter the river during base-flow conditions....

Safety Analysis of Handset Wood Slab Formworks
A reliability index is calculated for flexural strength of a handset wood slab formwork system. Load and resistance models are based on a survey of construction loads and wood test data...

Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...

Temporary Traffic Deck Over Braced Excavation
A case history is used to examine the planning, design, and installation of a temporary traffic deck over a 23-foot-deep braced excavation. The deck was installed in a three-phase sequence...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...

Who Pays for the Unexpected in Construction: Hi-Rise Engineers Point of View
The unexpected in high-rise construction can be traced to design criteria evolving from environmental models and probes, as well as 3 general problems dealing with quality control in contract...

Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...

Ductile Frames Are Tough for Earthquakes
Implications of a new structural system in wharf design go far beyond San Francisco Bay, where two such wharves remained intact after the 1989 Loma Prieta quake. The design, introduced...

 

 

 

 

Return to search