Effect of Planning Errors on Construction Safety
A discussion of the planning phase of the building process associated with all the activities that are accomplished during this phase is presented. The different types of errors that occur...

Stabilizing a `Mann'-Sized Sinkhole
On Sept. 21, 1988, a sinkhole suddenly developed beneath a transmission/distribution effluent pipeline on Mann Road in Orange County, FL. Initially it measured 30 ft in diameter and 8...

The Great Quake: On Site Reports
Written within two weeks of the Oct. 17, 1989 California earthquake, these comments cannot be considered definitive. But they do stress two points: 1) Earthquake codes do work. Buildings...

Optimal Design of Small-Scale Hydro Projects
A nonlinear programming model is developed in this study to determine optimal pipe size, the type and number of turbines and the installed capacity for small scale hydro projects. The...

Reliable Operation of Hydro-Thermal Power Systems
The demonstrated model allows planners to account for both operating and shortage costs, subject to a constraint on the system failure rate. In addition, the optimal long-term operation...

Dam Safety Emergency Action Plans?A TVA-State Responsibility
The Federal Guidelines for Dam Safety requires each dam owner to prepare and maintain emergency action plans (EAP) for each of structure. These plans are necessary (1) to identify problems...

Appropriate Design and Construction of Conduits for Small and Mini Hydropower
The success of smaller hydro schemes often lies in identifying feasible and economic waterway systems to develop relatively high heads between low intake weir and powerstation. This paper...

Milltown Powerhouse Rehabilitation
The Milltown Powerhouse and dam are over 80 years old. The powerhouse and other structures were built in 1906 and are owned by the Montana Power Company. The plant is located on the Clark...

Isabella Project?Retrofit of Existing Tunnel
This paper explains conceptual methods of reinforcing and lining the section of the existing tunnel downstream of the three control gates to the exit portal and bifurcation for the power...

Major Hydraulic Turbine Operation and Maintenance Problems Experienced by the Corps of Engineers
The U. S. Army Corps of Engineers is the largest owner/operator of hydroelectric power generating facilities in the United States with 344 generating units, having an installed capacity...

Synopsis of Harry S. Truman Turbine Repair
The Harry S. Truman Powerplant was designed and constructed under the supervision of the U. S. Army Corps of Engineers and is located on the Osage River near Warsaw, Missouri. During 1981...

Influence of Surface Finish on Thrust Bearing Life
The original pivoted pad thrust bearing installed and fitted at the Holtwood Power Station in 1912 by A. Kingsbury has been operating continuously since that time without any difficulty....

Accelerated Life Testing of Generator Coils
This paper presents a step-by-step procedure for doing a 400 hour, 60 Hz, 90 degree C accelerated life test on generator coils. Test procedure is as follows: 1. Initial coil examination...

Fretting Corrosion on Large Split Thrust Bearing Runners
In the early fifties interfacial slip was measured on laboratory models. Design improvements, resulting from these tests, were incorporated into later machines. These improvements appreciably...

Upriver Dam Hydroelectric Project Rehabilitation After Failure, Part A: Failure Investigation and Lessons to be Learned
A lightning strike caused electrical failure at Spokane's two Upriver power plants, resulting in the river overtopping Project embankments, and causing nearly 11. 5 million...

Upriver Dam Hydroelectric Project Rehabilitation After Failure, Part B: Rehabilitation and Enhancement of Project Civil and Mechanical Facilities
A feasibility investigation of rehabilitation alternatives was conducted which identified several alternatives for repairing the damage and placing both powerhouses back on-line. These...

Grout Supports Brooklyn Tunneling
At the Red Hook project in Brooklyn, microfine cement grout was injected from the surface to support underground tunneling. The hand-dug tunnel was built to connect to sewer pipes. Subsurface...

A Station With a View
The Port Authority TransHudson Corp. (PATH) is renovating and expanding Exchange Place station, the first stop in New Jersey across the Hudson River from lower Manhattan. To be completed...

The MPSP System: A New Method of Grouting Difficult Rock Formations
In unstable rock masses the traditional stage grouting methods may prove impractical or ineffective. A recent innovation has been the Multiple Packer Sleeved Pipe (MPSP) System. Akin to...

Treatment of Karst Along Tennessee Highways
The construction and maintenance of highways in karst areas of East Tennessee has resulted in the occurrence and treatment of induced sinkholes along the ditchlines of numerous highways....

 

 

 

 

Return to search