Classifying Constructability Information
Integration of constructability information in the early stages of a project is known to provide significant savings opportunities for cost and schedule. One critical part of such a program...

Constraint Management for Concurrent Design and Construction Using an Object-Oriented Project Model
To realize a richer communication among multiple disciplines participants of A/E/C project, an object-oriented product or project model is useful and powerful. especially sharing and maintaining...

The Use of Numerical Rule Processors in Engineering Calculations
A Numerical Rule Processor uses a declarative approach to the processing of engineering calculations. The rules which link the parameters are set out in a separate rule base and the order...

Creative Engineering Design Using Analogy
Designs in different domains vary in structure, performance and in many other aspects. However, their design purposes can be achieved in a limited number of ways. In this paper, we classify...

A Shape Annealing Approach to Creative Design of Structures
This paper shows how shape grammars can be used to model structural engineering problems. The shape annealing algorithm is then used to synthesize component topologies by bringing analysis...

Computer-Supported Creative Structural Design
In this paper, a model for creative engineering design using a network-based design prototype representation and a mutation technique is presented. The model distinguishes between a domain-dependent...

Optimal Processor Mapping for Massively Parallel Finite Element Computations
The exploitation of massively parallel computer for finite element analysis requires efficient usage of processors as well fast speed. For example, the efficiency of a parallel matrix...

Verification of Real-Time Software for Active Structural Control
In this paper we give an overview of our preliminary work in verifying the reliability of real-time software systems for active structural control. While there have been numerous studies...

Simulative Calculation of Highrise Building Structure Under Vertical Loads
It is well known, the general structural stiffness and the vertical construction loads are formed storey by storey from bottom to top of the building especially for cast R.C. structure....

Parallel-Adaptive Finite Element Analysis on a Transputer Cluster
This paper describes a parallel-adaptive finite element approach on a parallel transputer cluster of the MIMD type. The analysis is controlled by a special error indicator. In comparison...

The Influence of Preform on the Vibration Mode of a Thin Plate
In this paper, an algorithm is developed for the calculation of the vibration mode of a preformed thin plate. The principal governing equations are derived by using the large-deflection...

Time-Dependent Analysis of Nonprismatic Curved PC Box Girder Bridges
The purpose of this paper is to present a step-by-step computer method for predicting the deflection and stress distribution duo to creep and shrinkage of concrete in nonprismatic, curved,...

Facilities Management System with CAD and Information Control Tools
This paper concerns the establishment of a facilities management (here after referred to as FM) system using ready-made computer software. In general, most so-called FM systems consist...

Standards for Digital Exchange of Information in the Building Industry
The computer has been used as an effective tool in civil engineering practice for over three decades. During that time numerous software vendors have developed their own proprietary formats...

Project Modeling and Data Standards for AEC
Computer-integrated construction (CIC) will provide the architecture, engineering, and construction (AEC) industry with improved computer tools and will support an overall trend towards...

Integrating Database and Geometric Modeling Technologies to Manage Facility Information
Existing engineering data models provide various means of representing, organizing and linking information about constructed facilities in a computer-integrated environment. However, they...

DScheduler: A Deductive Database for Scheduling Building Construction Tasks
Computer applications in the construction domain, such as construction scheduling and estimation, require a large amount of data. Reasoning with complex data is facilitated by Artificial...

Construction Information Management
Use and characteristic of Information Systems in the organizations has been changed significantly. These systems are not functionally oriented any more and they do not have any bias toward...

Containing Construction Change with Computers
This paper discusses the benefits of managing construction change orders with computers over manual methods. Construction contracts formulate change procedures that are often at odds with...

Using Product Models to Plan Construction
The conceptual design of the CasePlan case-based planning and scheduling system is presented. Case-based reasoning is a promising technique for capturing the expertise of contractors who...

 

 

 

 