The Design of Macagua Concrete Face Rockfill Dam
This article describes the design characteristics of the concrete face rockfill dam at Macagua, which will have a total length of about 9,200 ft (2,800 m), an average height of 66 ft (20,0...

The Upstream Zone in Concrete-Face Rockfill Dams
The upstream zone of small rock, the supporting zone for the slab at many recent concrete-face rockfill dams has contained less than 20% of particles smaller than the No. 4 sieve. Such...

Design of Cirata Concrete Face Rockfill Dam
The Cirata Hydro-Electric Project on the Citarum River in Western Java, Indonesia is at present under construction for Perusahaan Umum Listrik Negara (PLN). The project which is being...

Concrete Face Rockfill Dams?Design, Construction, and Performance
Concrete face rockfill dams are being used with greater frequency and to greater heights in the last decade. The developments leading to this progress are many and are addressed in the...

Current Corps of Engineers Concepts for Roller Compacted Concrete in Dams
Since construction of Willow Creek Dam in 1982, Elk Creek Dam in southwest Oregon is the only Corps of Engineers dam to be constructed using RCC that has passed beyond the planning stage...

Watertightness and Seepage Control in Roller Compacted Concrete Dams
An unjointed mass of roller compacted concrete (RCC) can easily be proportioned and compacted so that it is essentially impermeable and 'watertight. ' Permeability tests of various field-placed...

Construction of Two Spillways Using Roller Compacted Concrete
Roller Compacted Concrete (or RCC) is a relatively new method of construction and in many projects can be a low cost alternate to or foundation for conventional reinforced concrete. The...

Construction of Middle Fork Dam
Recently there has been increased interest in roller compacted concrete (RCC) for use in dams. However, to date there has been very little practical experience in construction. Middle...

Construction of Recent RCD-Concrete Dam Projects in Japan
The Japanese Ministry of Construction has organized a committee which has been promoting research concerning rationalized concrete dam construction. A part of this research is the work...

Upper Stillwater Dam Construction Program
Utilizing both proven and innovative construction techniques, equipment, and design concepts, Tyger Construction Company Inc. , located in Spartanburg, South Carolina, has undertaken the...

Economic Considerations in Selection of a Roller Compacted Concrete Dam
Roller compacted concrete (RCC) has recently emerged as an economically attractive material for gravity dam construction, replacing the use of conventional concrete and even challenging...

USBR Design Considerations for Roller Compacted Concrete Dams
Current Bureau design criteria for concrete dams are based on analytical methods developed and improved over the years, evaluation of construction methods and post construction materials...

Rail and Road Traffic Continue During Bridge Modification
The crossing of Route 15 under the Bangor and Aroostook Railroad Bridge, Bangor, Maine had limited sight distance and marginal clearances. Maine Department of Transportation, therefore,...

Application of Methods of Probabilistic Characterization of Soil Properties
The use of probabilistic methods to describe soil properties has many applications. One such application that has been developed is in the area of probabilistic slope stability analysis....

River Lock Rehab: A Winter's Tale
Lock & Dam �1 on the Mississippi River between Minneapolis and St. Paul had deteriorated badly but the U.S. Corps of Engineers determined that replacement with a new structure...

The Sand Dam
Currently under construction is the 443 ft. high sand fill dam. Being erodible, pervious and liquefiable, sand would normally be considered as n unsuitable material to construct LaVueltosa...

Water Supply
The Foothills Project adds 125 mgd (5.5 m�/s) to the Denver area water treatment capacity, and saved approximately $1 million in energy costs in the first year of its operation. The $163...

Prefab Power
The Love Hydroelectric Generating Station, owned by the city of Vanceburg, Ohio, was prefabricated in France complete with all components, brought across the Atlantic and towed to Greenup...

Flood Control
The Hamilton and Riemer reservoirs were constructed by excavating pits below grade to receive flood overflows from adjacent streams. The two reservoirs are part of a 52 sq. mile (135 km�)...

Grouting Rehabs Earth Dam
To accommodate increased storage needs the Pennsylvania Power & Light Company had to reactivate a fly ash basin and raise an adjacent embankment dam. However, seepage through the...

 

 

 

 

Return to search