An Isolated Wetland Used for Stormwater Treatment
A marsh used for stormwater management showed gradually increasing levels of pH, dissolved oxygen and conductivity in the flow path. The system was especially effective in removing suspended...

Snake Reservoir Drawdown ? A Brief Progress Report
The Northwest Power Planning Council has directed the region to employ the use of 'Drawdown' as tool to help threatened and endangered salmon stocks in Snake and Columbia rivers unless...

Water Quality Impacts from Development of Port Ludlow, Washington
Port Ludlow Bay is a tidal estuary located adjacent to Admiralty Inlet in Puget Sound, Washington. A planned development has been under construction along the bay since 1976. A 0.64 mgd...

Water Quality Model of the Chicago Waterway
In 1992, the Metropolitan Water Reclamation District of Greater Chicago (the District) developed a QUAL2E water quality model of the Chicago waterway and Upper Illinois waterway. The model...

Optimization of Operations?The Manitoba Hydro Experience
As part of a decision support system, Manitoba Hydro implemented a comprehensive optimization model for operations planning in the mid 1980's (Barritt-Flatt and Cormie 1991). Since that...

Impacts of Hydropower Operation on Water Supply from Lower Colorado River in Texas
The Lower Colorado River Authority (LCRA) of Texas is both a water and energy supplier to a large area of Central Texas. LCRA generates approximately 10 percent of its power from hydroelectric...

GIS Reconstruction of Exposure to Water Supply Contaminants
Groundwater pollution resulting from improper waste handling practices in the aerospace industry contaminated the water supply in Tucson, Arizona. State and federal health officials concluded...

Seasonal Water Quality Management Given Sparse Data
An approach for designing robust seasonal water quality management programs for river basins with sparse or short flow records is presented. This approach uses Markov chain modelling and...

Wynoochee Lake and Dam?Flood Storage Reevaluation Study
With the desire to increase the revenue generating potential of the Wynoochee Lake and Dam Project the cities of Tacoma and Aberdeen, Washington, have pursued the potential for retro-fitting...

A Planning Strategy for Safe Drinking Water Act Compliance
This paper presents a simple planning strategy for drinking water utilities that will allow them to move ahead with system upgrades and specific regulatory compliance programs even though...

Hydrologic and Structural Considerations for the Initial Filling of Jiguey Dam, Dominican Republic
This paper describes the hydrologic and structural considerations of the initial filling of Jiguey Dam which is locate on the Rio Nizao about 100 kilometers west-northwest of Santo Domingo...

Geothermal and Hydropower Production in Iceland
This paper will first consider the technical aspects of both hydropower and geothermal power production in Iceland. Then the economic consequences of the alternative utilization of these...

Identifying the True Issues of Hydropower Resource Development in an Era of Public and Regulatory Policy Transition
The last several years have produced changes in public and regulatory policy that have provided for increased roles and participation of resource agencies, Native Americans, and the public...

Groundwater Contaminant Transport at a Hazardous Waste Disposal Site, Pullman, Washington
Groundwater contamination at a hazardous waste site near Pullman, Washington is simulated by a numerical model. The aquifer at the site is classified as an unconfined valley aquifer. Solute...

Investigation and Rehabilitation of the Moses Lake Larson Wellfield
In 1988, low levels of trichloroethylene (TCE) were detected in several of the Larson wells operated by the City of Moses Lake. The wells are up to 800 feet deep and are completed in fractured...

Strategies for Developing Major Capital Facilities
Siting, permitting, and mitigating impacts present many challenges during the development of major capital facilities. As a result of the need for public involvement, environmental review,...

The West Point Story?Chapter 1: Overview and Planning
The West Point wastewater treatment plant is the Seattle metropolitan area's largest wastewater treatment plant, and it is being upgraded to provide secondary treatment. The planning,...

The West Point Story?Chapter 2: Project Management Approach
In 1985, serving as the program lead, Metro contracted with Lewis Zimmerman Associates to conduct a formal facility planning effort for the West Point wastewater treatment plant. It was...

The West Point Story?Chapter 3: An Integrated Park and Treatment Plant
The West Point Wastewater treatment plant in Seattle sits on a small parcel of land that juts out into Puget Sound. In 1984, controversy erupted when Seattle Metro recognized that West...

The West Point Story?Chapter 4: Design
Metro's approach to design was one of integrated environmental and plant design. The project team, with guidance from the community and the city's parks department, established goals before...

 

 

 

 

Return to search