Reduced O&M Costs through Better Metallurgy
There are many areas in hydroelectric power plants where better materials of construction can reduce operation and maintenance (O&M) costs. Some of the most nagging problems deal...
CAD Speeds Viaduct Replacement
Lack of an available detour around construction of a major viaduct spurred city officials in Reno, Nev. to build a bridge nearby to serve the purpose. Although funded separately, the permanent...
Storing Sediment and Freeing Fish
When Mount St. Helens erupted in May 1980, it sent a river of pyroclastic ash and other debris into Washington's North Fork Toutle River Valley. The resulting debris pile...
Post-Tensioned Transportation
Post-tensioned highways are relatively new. U.S. 220 near Altoona, Pa. has the first major installation in the country. There two miles of pavement are continuous concrete panels, each...
Unbonded Performance
Unbonded single strand tendons have been used in the U.S. for about 30 years. In a small number of buildings, strand corrosion failures have occurred. Although it is clear that post-tensioning...
New Roof for an Aging Temporary
The wartime temporary design of a 1942 industrial building justified use of green timber for its roof trusses and higher than usual allowable design stresses. Some 45 years later, a new...
Isolated Examples
The technology of seismic isolation, also known as base isolation, is being used to protect the contents and occupants of a building as well as its structure. Isolators are led-rubber...
Knowledge-Based Construction Project Planning
This paper describes CONSTRUCTION PLANEX as a prototype of a knowledge-based construction process planner. CONSTRUCTION PLANEX is a knowledge-based system that generates project plans...
Tunnel Talk
Much talk in tunnel circles has centered on various methods of tunneling, especially the new Austrian tunneling method, or NATM. To be a true tunneling method it must provide a description...
Building Onto History
In a single design/build/renovation project, an Oklahoma City AE firm acquired new offices, provided new life for an abandoned historic church building and spearheaded redevelopment of...
Bells Under Bells
Chicago's newest office tower is supported on new bells that had to be constructed below existing belled caissons. Existing caisson foundations from a previous structure on...
Beam-Supported Slabs Subject to Edge Loading
A model is presented which allows a designer to estimate stiffnesses required to provide a given critical buckling load in beam-supported slabs subjected to biaxial edge loading, such...
Downramping to Minimize Stranding of Salmonid Fry
The objective of this study was to develop a downramping regime for the Jackson Hydroelectric Project on the Sultan River in Washington that minimizes the stranding of juvenile salmon...
A Juvenile Fish Bypass Program at Columbia River Basin Projects
Hydroelectric development in the Pacific Northwest region has altered the natural flow of the Columbia River and its major tributary, the Snake River. This has proven to be detrimental...
Isabella Project?Retrofit of Existing Tunnel
This paper explains conceptual methods of reinforcing and lining the section of the existing tunnel downstream of the three control gates to the exit portal and bifurcation for the power...
Bath County Tunnel System/Remedial Treatment Program
The Bath County Pumped Storage Project, owned jointly by Virginia Electric and Power Company and Allegheny Generating Company, is located 70 miles (112 km) north of Roanoke, Virginia....
Dependence of Fatigue Damage on Loading Amplitude Variability
Welded steel specimens have been tested under variable amplitude loadings to determine the extent to which fatigue life is affected by the rate of amplitude variability of the loading...
Probabilistic Fatigue Crack Growth Analysis with Reliability Updating
A randomized fatigue crack growth model based on the Paris and Erdogan crack growth equation is used to estimate the reliability of fatigue sensitive details in steel bridges. This model...
Fracture Control for Arctic Vessels and Structures
Materials used for construction of Arctic structures and vessels are exposed to low ambient temperatures, high local ice loads and intermediate to high loading rates. All these factors...
Bridge Reliability Evaluation Using 3-D Analysis and Damage Scenarios
This paper reports analytical investigations into the system strength and reliability evaluation of existing bridges using 3-D inelastic analysis and damage scenarios. In this context,...
Return to search