Additional Benefits from Channel Improvements
This paper describes techniques used to quantify three types of benefits resulting from enlarging the Houston Ship Channel. These benefit types are vessel casualty reduction, delay reduction...

National Port Issues
The adequacy of U. S. ports to meet the Nation's present and future needs was evaluated by a Committee of the Marine Board, National Research Council. The changing character...

Capacity Rating of Existing Piers and Wharves
This paper outlines a method for physically surveying the present material condition of existing piers and wharves and assigning to them a safe rated capacity expressed in displacement...

Port of Kismayo (Somalia) Rehabilitation
Extensive deterioration of the 2070 ft long four-berth, marginal wharf at the Port of Kismayo necessitated a major rehabilitation to maintain operations. The selected scheme was a steel...

Overdredging at Existing Gravity Structure
Pacific Elevators Ltd. decided to upgrade Berth No. 2 to handle ships up to 70,000 DWT. The difficulty was to maintain the support of the cribs after dredging of the berth to minus 45...

Underwater Compaction of Sand Fill During Placement
A system and related equipment have been developed, and tested on a recent dredged fill project, to compact sand, either clean or with limited silt, in lifts several feet in thickness...

Seismic Design of Earth Retaining Wharf Structures
Seismic design considerations pertinent to earth retaining wharf structures are reviewed. These considerations include: evaluation of the seismic environment and design earthquake ground...

Marginal Wharf and Embankments?Seismic Design
This paper presents some of the seismic considerations used for the improvements at Berths 225 to 229 at the Port of Los Angeles. The design of the improvements was complicated by the...

Local Government Infrastructure Management
The collection of papers presents real world experiences and practical suggestions for improving infrastructure management in local governments. A case study is presented on how a computer-based...

Ports '86
Ports '86 had the theme of Innovations in Port Engineering and Development with keynote speakers looking ahead to Port Development in the 1990's. The program...

Parking Lot Gets White Top
The many-acre parking lot at the Valley Fair Mall shopping center in Salt Lake City, Utah is described. In 1985 the asphalt pavement was overlaid with concrete, making it one of the relatively...

Port Infrastructure Program in Mexico
In Mexico the policies, guidelines, goals and methodologies refering to transport, are the responsibility of the 'Secretaria de Comunicaciones y Transportes'...

Wave Height Distribution in the Coupled Harbor
Wave height in a harbor sheltered by a breakwater is studied by numerical simulation and experiment. The coupled harbor, attained by setting up double arm breakwaters, was adopted as the...

Dredged Spoil Storage Basin in the Coastal Waters Near Rotterdam
The maintenance dredging for the Rotterdam harbour area amounts to 23 million m**3 per year, 10 million m**3 of which is polluted to such an extent that a controlled storage is required....

Land Renewal with Topsoil from Clyde Port Dredgings
The paper examines the potential of using sediment dredged from the River Clyde estuary as a topsoil in land renewal. It presents results, to date (1986), of a study sponsored by the Scottish...

Dredged Material Disposal in the Lower Great Lakes
The Buffalo District Corps of Engineers is responsible for dredging the harbors in Lakes Erie and Ontario. Approximately 2,000,000 cubic yards (1,529,000 cubic meters) of material are...

Oxygenation of Releases from Richard B. Russell Dam
The oxygen injection system at the Richard B. Russell project has a continuous injection system located 1 mile upstream of the Russell damsite but also has supplemental injection capability...

Colorado High Mountain Aquifer Study
This paper describes the potential for formulating water projects in Colorado using the storage capability of high mountain glacial aquifers. Although a terminal moraine provides a natural...

Utopia Under Glass
We stand within sight of the day when our reserves of fossils fuel will be inadequate to maintain the type of energy inefficient cities we have grown used to. This exercise in urban planning...

Managing Two Projects as One
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985, only 26 months after signing a binding agreement. The project, which also...

 

 

 

 

Return to search