Overtopping Flow Spillway for Baldhill Dam, Sheyenne River, North Dakota
An existing gated spillway structure for Baldhill Dam and Reservoir (Lake Ashtabula, North Dakota) is not capable of passing floods up to the probable maximum flood (PMF) without overtopping...
Overtopping Protection for A. R. Bowman Dam
Arthur R. Bowman Dam is a 245-foot-high (74.7-m) central-core rockfill dam located on the Crooked River in central Oregon. The probable maximum flood (PMF) would overtop the dam by 20...
Innovative Reregulation Weirs for Dam Releases
Two different reregulation weir designs for dam release improvement are discussed. A porous timber crib is favored for applications where increased minimum flow is needed, and a labyrinth...
Health Benefits From the Use of Appropriate Technologies in Water Supply and Sanitation
Research on selected diseases in developing countries has found significant health impacts from water supply and sanitation interventions. Sanitation, personal and domestic hygiene, and...
Application of Appropriate Technology in Hydroelectric Project Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. A primary concern is spillway and stability inadequacies resulting...
Design of High Capacity Spillways for Ritschard Dam, Colorado
A hydraulic model investigation was conducted by the Bureau of Reclamation to assist in designing the hydraulic structures associated with Ritschard Dam. Ritschard Dam will have a labyrinth...
Dam Break Analysis for a Series of Dams Using the HEC-1 and DAMBRK Computer Programs
The HEC-1 and DAMBRK computer programs were developed by the US Army Corps of Engineers, Hydrologic Engineering Center (HEC) [3] and by the National Weather Service (NWS) [4], respectively....
Sedimentation Problems and Solutions: Roseires Dam and Reservoir, Sudan
Roseires Dam and reservoir are located in Sudan, Africa on the Blue Nile River. The hydropower from the reservoir provides approximately 80% of the power used in Sudan, thus having a tremendous...
Dam Removal Methods, Elwha River, Washington
Preparation of an Environmental Impact Statement (FERC, 1991) for licence applications for the Elwha and Glines Canyon hydroelectric projects on the Elwha River, Washington, included evaluation...
Sediment Modeling of Dam Removal Alternatives, Elwha River, Washington
The new version of the U.S. Army Corps of Engineers (ACOE) 1-Dimensional sediment transport model, HEC-6 'Scour and Deposition in Rivers and Reservoirs', was...
Sediment Problems Associated with Dam Removal, Muskegon River, Michigan
This paper presents an analysis of sediment movement in Michigan's Muskegon River following the removal of Newaygo Dam. The analysis utilized a physical process simulation...
Predicted Fluvial Response to Dam Removal in the Kalamazoo River Valley, Michigan
Research has been conducted by the Michigan Department of Natural Resources (MDNR) to predict the fluvial response to dam drawdown and determine the distribution of recent deposits along...
Computerized Hydraulic Modeling?A Case Study
A hydraulic model study is being conducted at the Alden Research Laboratory, Inc. (ARL), to study the effects of adding a hydroelectric generating station at the site of an existing lock...
Gropps Lake Dam
Gropps Lake Dam has a concrete ogee spillway with earthen abutments at either end of the spillway. The dam features an internal drainage system, outlet works, an energy dissipator, a steel...
On The Application of Artificial Viscosity in Computational Hydraulics
Artificial viscosity is a particular kind of truncation error that is either implicity present or explicitly added to the finite difference schemes. It is shown that the method of lines...
The Benefits of U.K. Guidance for Temporary Works
In British contracts the Contractor is responsible for the design and execution of temporary works unless the Design Engineer or the Client expressly instruct how the work is to be undertaken...
Current Legal Issues Impacting Temporary Works in Construction
There are two evolving areas of legal concern to the engineer and contractor involved in any aspect of temporary construction. The interpretation and application of the Occupational Safety...
Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....
Specifying Trench Safety: the Texas Experience
The frequency of accidents during trenching operations has grown so dramatically that the issue has caught the attention of both industry 'insiders' and 'outsiders.'...
Fall Protection & Debris Containment During Construction
The purpose of this paper is to review the current practices in the United States for both fall protection and debris protection during high rise construction. A performance comparison...