New Exchequer Dam, California
New Exchequer Dam design, in 1963, was in the transition period in which dumped rockfill was being recognized as having undesirable settlement characteristics, and compaction of rockfill...

Design and Construction of Terror Lake Dam
Terror Lake Dam is a central feature of the 189 million Terror Lake Hydroelectric Project, located on Kodiak Island Alaska. The dam is a 193-feet (59 m) high concrete-faced zoned rockfill...

Design and Stability Evaluation of Balsam Meadow Dam
The proposed Balsam Meadow Dam is a 126 feet high concrete-faced rolled rockfill dam currently under construction for the Balsam Meadow hydroelectric project in California. Detailed field...

Low Cement Content High Strength Concrete
The fundamental objective of this research project was to develop mix design information for structural grade concrete using high fly ash content. The fly ash used in this project was...

Foundation Design Considerations for Detroit DPM
The design loadings for support of the elevated guideway of the Detroit Downtown People Mover (DPM) consist of high vertical as well as horizontal loads. In order to simplify foundation...

Applying an Automated Storage and Retrieval System to a Centralized Bus Maintenance Facility
Gannett Fleming recently completed the design of a new Central Maintenance Facility for the Southern California Rapid Transit District. An integral part of this facility is an automated...

Structural Vibrations Associated with Large Incubation Tanks
It is the purpose of this paper to describe the format of an investigation wherein the train of evidence led from an assumption of a strictly mechanical cause to an actual cause that was...

Aseismic Capability Prediction from Failure Data
Forensic engineering evaluations of failures have produced a wealth of technical data. In this paper, evaluation of representative failure data from one practitioner provided relevant...

Development of Flood Peak Regression Equatins for Small Watersheds in Southwest Florida
Hydrologic investigations were performed on the Belle Meade-Royal Palm Hammock area in Collier County, Florida. The study area, encompassing approximately 79 square miles (205 km**2),...

Salt Lake City Flood Experiences
Salt Lake City experienced snowmelt floods during 1983 and 1984. Peaks during these years were very high with many historic records being set in both years. Different and unique problems...

Drain Maintenance in the Imperial Valley
Imperial Valley, located in the southeast corner of California is one of the most intensely irrigated areas in the world. Since Colorado River salinity is currently about 800 mg/l (1....

Physical Evaluation of a Buried Drainage System
The drainage problem in the 600,000 acre (1. 5 million ha) Westlands Water District (District), located in the Central San Joaquin Valley in California is that of a perched saline groundwater...

Streamflow Losses in the Santa Cruz River, Arizona
The discharge and volume of flow in a peak decrease as the peak moves through an 89-mile (143 km) reach of the Santa Cruz River. An average of three peaks per year flow the length of the...

Development of a Multi-Modal Information System
This paper outlines the design and development of a Multi-Modal Information System in Duluth, Minnesota. The system applies state-of-the-art microcomputer technology to the provision of...

Upgrading to Super-Micros
The Association of Central Oklahoma Governments (ACOG) is a regional planning agency and Metropolitan Planning Organization in central Oklahoma, responsible for maintaining a large data...

Security Issues for Microcomputers
This paper addresses microcomputer security in the context of a transportation agency. Schemes for physical protection of hardware, such as locking workstations and alarms, are examined...

Microcomputer Software Support at the State Level
This paper describes a case where the organizational approach to microcomputer control was taken and contrasts the results with optimal individual systems within the group. In this context,...

Microcomputer Needs of Small and Mid-Sized Ontario Transit Properties
This paper describes some current initiatives in Ontario, Canada by a central funding agency to support and encourage the use of microcomputers in small and mid-sized transit properties....

The Group Approach to Implementing Micro Systems
This paper highlights a nearly three year effort to implement microcomputer information systems on 16 small and medium sized transit properties in Wisconsin using a 'group...

Micro/Mini/Maxi?Hardware or Software, Or, What's the Future??What's the Answer?
Current research is developing new materials, producing more sophisticated circuits, allowing price reductions, linking micros and minis to mainframes. The next technological avalanche...

 

 

 

 

Return to search