Earthquakes Will Not Damage This Bridge
A California pipeline bridge has been retrofitted with isolation bearings that damp earthquake shocks. The bridge over Southern California's Santa Ana River carries the Upper...
Experiences in Pneumatic Wave Energy Conversion in Japan
Several prototype and model studies of pneumatic wave energy conversion systems are discussed. These include those of the floating platform KAIMEI, the fixed system at Sanze and the new...
Prototype Wave Power Stations in Norway
The KVAENER multi resonant oscillating wave column (MOWC) power station is both described and discussed. The power station, which is now on-line, is designed to produce 1 MW of peak electrical...
Operational Experiences With a Wells Turbine on a Wave Powered Navigation Study
The objective of the research programme was to design a 100W Wells turbine generator unit which could be matched to standard tail tube buoys. Optimization of the power conversion chain...
A Comparative Study of Two Capture Chamber Geometries
Results of an experimental study of two capture chambers are presented. The capture chamber geometries are those that have been either used or recommended in conjunction with pneumatic...
Studies With, and Testing of the McCormick Pneumatic Wave Energy Turbine With Some Comments on PWECS Systems
Work done in developing concepts for pneumatic wave energy conversion based on theoretical analyses of the hydrodynamic, pneumatic, and mechanical systems with some estimates of performance...
Converted Wave Energy Transmission, Storage and Integration
Results of a number of full-scale studies of transmission, storage and integration of electricity resulting from wave energy conversion are discussed. These studies involved the floating...
Preliminary Design and Construction Plan for an Ocean Wave Energy Conversion System
A preliminary design and construction plan for a prototype wave energy conversion system is described. While the design methodology and construction procedures are intended for generic...
Economic factors of Wave Energy Conversion
The paper provides some insights into the institutional setting in which power marketing is conducted (in the United States). It presents some approaches to economic evaluation that might...
Wave Energy Research in Ireland
Measurements taken at several locations off the Irish coast show that the average power intensity available to Ireland well exceeds 20 kW/m. Several projects have been undertaken in an...
On the Performance of a Wave Power Converter
This paper presents the KN-principle for wave - power conversion. The principle and components of the wave power converter are described and some practical relations are presented in order...
Optimal Strategies for Phase Control of Wave Energy Devices
Phase control has previously been proposed for increasing energy output from wave power devices, and latching strategies have been tested for point absorbers and for pneumatic devices....
Application of Satellite Remote Sensing for Identification of Irrigated Lands in the Newlands Project (
As one element of Operating Criteria and Procedures for the Newlands Project in west-central Nevada, the Bureau of Reclamation has compiled an irrigation water rights spatial data base....
Solution to a Waterhammer Problem: A Case Study
Waterhammer is caused by a rapid change in the flow velocity of liquid in a pressurized pipeline. Therefore, the potential for waterhammer exists in almost every pressurized liquid piping...
Water Supply System Rehabilitation
This report was prepared to assist practicing engineers meet the challenge of rehabilitating old drinking water systems, many of which have been in existence for over 100 years and are...
An Improved Method to Predict Annual Transit Fare Revenues from Mid-Year Results
Effective short-term financial management of transit systems requires the same three general actions necessary to manage all service oriented industries: 1)monitoring of short term (usually...
Database Management Systems for Urban Facilities
This paper discusses design and implementation issues associated with the development of database management systems (DBMS) for urban facilties. Many of the experiences described here...
Improving the Financial Basis of Transit Planning
Three examples of new transit capital management procedures are described: a Plant and Facilities Development Program and Bridge Management System for Boston's Massachusetts...
Evaluation of the Utilization of Information Systems in the Arizona D.O.T.
The design of effective information systems requires a rational analysis effort to determine specifically what functions are to be served by the system and how the system can satisfactorily...
A Knowledge-Based Approach to Improve Urban Transportation Decision-Making
This paper describes a microcomputer-based tool that has been developed to facilitate acquisition and improvement of skills in urban transportation decision-making, in an educational environment....