Evaluation of the Ultimate Pressure Capacity of Rectangular HVAC Ducts for Nuclear Power Plants
Structural design criteria are presently based on the AISI Code which limits the duct panel width-to-thickness ratio to a maximum of 500 and the maximum height-to-thickness ratio to 200,...

Strength and Stiffness Characteristics of Steel Ladder-Type Cable Trays
Ladder-type cable trays identical with the as-built are generally tested to establish their strength and stiffness characteristics. Test data for systems in operating plants, however,...

Vibration Isolation of Cable Tray Hangers
Analytical and experimental investigations have been performed to partially evaluate the feasibility of using much more flexible support systems than those presently used to support electrical...

Piping Analysis: A Flexibility Approach
Design for the vertical and horizontal accelerations associated with a seismic event coupled with low allowable loads on equipment are two primary contributors to the current situation....

Composite-System Approach for Seismic Analysis of Secondary Systems
An accurate and efficient method for seismic analysis of multiply supported, multi-degree-of-freedom secondary subsystems is developed. The method accurately accounts for the effects of...

A Correlation Study on the Spectrum Decomposition Method
The major elements of the Spectrum Decomposition Method (SDM) are reviewed together with its automated process for generation of in-equipment response spectra (IERS). The floor required...

A Pseudo Response Spectrum Method for Mark I Loads
A pseudo base motion response spectrum method is developed to uniquely evaluate the periodic condensation oscillation and chugging drag loads that may occur on submerged structures within...

Stress Distribution Around the Equipment Hatch Opening of a Prestressed Concrete Containment for a PWR Power Station
Results are reported of a finite element stress analysis for the linear elastic deformation around the equipment hatch opening in prestressed concrete containment. The dimensions and form...

A Case Study in Low-Level Radioactive Waste Storage
Capital funds have been appropriated for the design, engineering, and construction of an interim low-level radioactive waste storage facility. This project is currently in the preliminary...

Simplified Design of Flexible Expansion Anchored Plates for Nuclear Structures
The following two phases of the design of expansion anchored plates are discussed in this paper. a) Initial Design. b) Reassessment of as-built conditions. Initial design refers to the...

Evaluation of Non-Ductile Drilled-in Expansion Bolts
This paper provides background and justification for the design of closely spaced non-ductile drilled-in expansion bolts (bolts). It describes testing used to establish allowable design...

A Computer Integrated Engineering System for Nuclear Plant Design
The design, construction, and licensing of nuclear power facilities is a long and complicated process which can span a time period of over ten years. This tremendous lead time to plant...

An Estimate and Evaluation of Design Error Effects on Nuclear Power Plant Design Adequacy
An estimate by the author is found of typical error levels contained in Structural-Mechanical-Civil Design and Stress Reports. Based on the original analysis performed to demonstrate design...

Winter Snowpack Augmentation in Utah
The snowpack enhancement cloudseeding program in Utah was operated continuously for ten consecutive years prior to the 1983-84 water year. It was designed to augment water supplies in...

Weather Modification Potential ? Santa Clara Valley
Santa Clara County of California has been a water deficient area. The Santa Clara Valley Water District has an obligation to the community and to the other water users in the State to...

Allen-McColloch Pipeline Computer Based Control System
The Allen McColloch Pipeline (AMP) was designed to deliver 416 cfs of treated water from the Metropolitan Water District of Southern California's Diemer Water Treatment Plant...

Automatic Controls for Industrial Water System
An 8-mile pipeline and associated facilities along its route are controlled by a centralized system consisting of a master station and four remotes. Each site employs Westinghouse programmable...

Economics of Groundwater-Pumping Level Statutes
Pumping from one well may lower the water table in another to the point where pumping from it becomes unfeasible. Problems exist in allocating the increased costs of pumping caused by...

San Joaquin Valley Hydrologic-Economic Model
The rapid development of agriculture in the San Joaquin Valley has resulted in increased ground water pumpage. Increasing energy costs coupled with increasing pumping lifts have a major...

Groundwater Basin Storage in Southern California
The feasibility of implementing a groundwater storage program in the Chino Groundwater Basin (Chino Basin) to increase the firm yield of the SWP (California State Water Project) is considered....

 

 

 

 

Return to search