Construction of CCM Overtopping Protection on Three Parkway Dams
Cellular concrete mat (CCM) systems have been installed as overtopping protection on three small embankment dams along the Blue Ridge Parkway. Based on field tests by others and on the...

Remedial Works at Troneras and Miraflores Dams in Colombia
The 38 m high Troneras and the 55 m high Miraflores earth dams were built in the period 1959-1965. The dams are composed of residual soils and founded on a deep residual overburden. Significant...

Liquefaction Potential Leads to Dam Reconstruction
Results of a visual inspection of the Dundee Dam conducted in 1982 revealed the presence of seepage on the downstream toe of the left embankment. Subsequent subsurface explorations and...

Construction and Verification of Ground Improvements at Mormon Island Auxiliary Dam
Mormon Island Auxiliary Dam, part of the Folsom Dam and Reservoir Project near Sacramento, California, is founded on alluvial materials that were dredged and processed for gold on several...

Trial Lake Dam Reconstruction
Trial Lake Dam is located in the Uinta National Forest in Central Utah at an elevation of about 10,000 feet. The dam is 50 feet high and stores 1,700 acre-feet of water for downstream...

Hydration Properties of Shotcrete with an Accelerator Based on Calcium Aluminate
A new powder-type accelerator based on calcium aluminate has been used for shotcrete in underground construction. This accelerator can be applied to all types of shotcreting. The shotcrete...

Design of Tunnel Lining from Shotcrete in Combination with Anchors
The method of designing tunnel linings from shotcrete in combination with anchors is given in the paper. The method is based upon the solution of the plane contact problem for a double-layer...

To the Limits of Shotcrete Linings
In the 1950s for the first time shotcrete was used because an essential support measure to guarantee the stability of an underground opening in Austria, Detzelhofer (1). Since that time...

Single-Shell Shotcrete Method
On a 60-m-long test stretch in the course of the construction of the Munich Subway the single-shell jointless shotcrete method was employed. In this case the standard cross section of...

Two Shotcrete Lined Tunnels in the United Kingdom
The paper describes two large diameter tunnels recently built in southern England where shotcrete has been used as the primary support. The design methodology is described together with...

Lattice Girders for Shotcrete Support
Lattice Girders complement the use of shotcrete for underground support by reducing the risk involved with using shotcrete alone for temporary or permanent lining of a tunnel or shaft....

Application of Shotcrete for Ground Support at Inco Mines
In 1989, shotcrete was first successfully introduced for ground support in production areas at Frood Mine. Until then the only successful application of shotcrete had been in major permanent...

Recycled Roads
The movement to recycle wastes in highways appears to be gathering momentum nationwide. Rubber from old tires, wood chips, reclaimed asphalt pavement, fly ash, scrap plastic, mining wastes...

Driving Under a Construction Site
Throughout the summer of 1992, vehicles passed unimpeded through one of the most heavily traveled intersections in Los Angeles County as construction proceeded on a concrete light-rail...

Supply-Side Solutions
Although the crumbling bridge infrastructure has received much attention in the press and the engineering community over the past few years, the number of structurally deficient bridges...

What Do You Mean by That?
The engineering and construction profession, like any other, has its own buzzwords and jargon. But as terms become ingrained in the profession's lexicon, they take on different...

The Long Term Interim Storage of Spent AGR Fuel
This paper describes the work undertaken by Scottish Nuclear Ltd. on the proposal to construct a naturally cooled dry store for spent advanced gas cooled reactor fuel at Tornes Power Station,...

Interim Dry Storage of CANDU Fuel
The Canadian approach to permanent disposal of used CANDU fuel is directed toward its storage in suitable containers emplaced into an underground, stable, plutonic rock formation. Reprocessing...

Hanford Waste Vitrification Project Overview and Status
The Hanford Waste Vitrification Project (HWVP) is being constructed at the U.S. Department of Energy's Hanford Site in Richland, Washington. The paper gives an overview of the HWVP which...

The Influence of Seasonal Climatic Variability on Shallow Infiltration at Yucca Mountain
To analyze infiltration and the redistribution of moisture in alluvial deposits at Yucca Mountain, water content profiles at a 13.5 m deep borehole were measured at monthly intervals using...

 

 

 

 