Strengthening the Design/Construction Interface Using Electronic Imaging, Document Management and Work Flow Technologies
The paper describes a conceptual approach for the implementation of document imaging systems as a mechanism for strengthening the design/construction interface. The paper discusses some...

Applying Multimedia Technology to Project Control
Construction project control and documentation require an accurate, complete, and efficient way of collecting, storing, and retrieving project information. This information contains construction...

Capturing As-built Project Information for Facility Management
Complete, accurate, and timely provision of as-built information plays a critical role in the optimal upkeep of a facility. Facility operators/maintainers usually are delivered a constructed...

Analysis of I-Girder Highway Bridges
Analysis of a bridge superstructure is complicated by the general geometric and loading conditions. Presented in this paper are three dimensional finite element modeling techniques used...

Bridge Rating Using Influence Surface for Curved Bridge Structures
A fairly sizeable number of curved steel bridges in Louisiana need to be rated and influence lines required to be stored. A methodology is developed and rating procedures are established....

Computer Analysis of Continuous P/C Highway Bridge Girders with Variable Depth
A computational procedure and associated computer program were developed for the analysis and design of P/C continuous beams with variable depth. Using this program, continuous girders...

A Decision Support System for the Expansion of International Operations of A/E/C Firms
The changing trend of the construction industry will require A/E/C firms to consider expanding operations in the international construction market arena. This paper presents a conceptual...

An Integrated Computer Model for Project Schedule Updating
Current schedule updating techniques rely mainly on field reports to specify completed work. Information provided in these reports are then manually summarized, analyzed, and input to...

Overlaying Digital Images with 3-D CAD to Document as Built Construction
A persistent problem in construction has been documenting changes which occur in the field and preparing as-built drawings. The accuracy and completeness of field measurements is often...

Graphic Visualization for Planning Heavy Lifts
The application of graphical visualization to construction can serve a wide variety of objectives and offers many significant benefits. Heavy lifts are an important component of industrial...

Building Product Model, A First Brick in Computer Integrated Construction
This paper describes the development of a product model as a basis for an information system. This new approach is based on modelling functions of building units rather than physical entities...

Developments to the IRMA Model of AEC Projects
The rapidly advancing fields of information technologies (IT) for AEC and computer-integrated construction (CIC) rely on the ability to represent and exchange information about AEC projects...

Information Modeling and Applications
The objective of this paper is to describe events and findings in the development of a comprehensive information architecture for a building. The information architecture has a goal of...

Machine learning Applications for Automated Constructability Reviews
Knowledge acquisition of the project design and construction site conditions is essential for determining construction project complexity. An effective knowledge acquisition method is...

ESPADD.BR: Expert System Producing Automated Designs and Drawings for Bridges
This paper presents the logic and methodology used in developing an automated software system for designs and drawings of bridges. Its primary purpose is to design and draw highway bridge...

Time-related Deflections of Cantilever Bridges
Many prestressed concrete bridges with spans between 100 and 160 m have been built in the Netherlands. The method of construction is the so-called in situ free cantilever construction....

An Artificial Neural Network Approach to Allocating Construction Resources
This paper presents an approach to alleviate the problem of depending upon human expert in allocating construction resources. This approach is using artificial neural networks to capture...

SELECTCRANE: An Expert System for Optimum Crane Selection
Every major project undertaken today requires the services of a crane(s) to ensure that all materials and equipment hoisting and placement are performed in the most efficient manner. The...

Construction Expertise Transfer with Knowledge Based Systems
The experience held by a cost estimating engineer is a valuable asset in every construction company. For a reliable cost estimation at the conceptual stage of a building project, the missing...

Intelligent Construction Planning
The intelligent construction planning is a stage of automated building realization process. The building is defined in the design stage by its spaces and functional systems. The automated...

 

 

 

 