Bath County Tunnel System/Remedial Treatment Program
The Bath County Pumped Storage Project, owned jointly by Virginia Electric and Power Company and Allegheny Generating Company, is located 70 miles (112 km) north of Roanoke, Virginia....

Dependence of Fatigue Damage on Loading Amplitude Variability
Welded steel specimens have been tested under variable amplitude loadings to determine the extent to which fatigue life is affected by the rate of amplitude variability of the loading...

Probabilistic Fatigue Crack Growth Analysis with Reliability Updating
A randomized fatigue crack growth model based on the Paris and Erdogan crack growth equation is used to estimate the reliability of fatigue sensitive details in steel bridges. This model...

Fracture Control for Arctic Vessels and Structures
Materials used for construction of Arctic structures and vessels are exposed to low ambient temperatures, high local ice loads and intermediate to high loading rates. All these factors...

Stochastic Finite Element Analysis of Frames with Flexible Connections
A procedure is proposed in this paper for the stochastic finite element analysis of frames with stochastic connection rigidity. A beam-column element is used to simulate the connection...

Bridge Reliability Evaluation Using 3-D Analysis and Damage Scenarios
This paper reports analytical investigations into the system strength and reliability evaluation of existing bridges using 3-D inelastic analysis and damage scenarios. In this context,...

Damage Accumulation Models for Bridges
In the study summarized in this paper the serviceability and ultimate limit states were reviewed for concrete and steel girder bridges. A model is proposed to evaluate strength and remaining...

Actual Versus Assumed Behaviour of Girder Bridges
It is generally believed that the discrepancies between calculated and actual responses of bridges can diminish, to the point of being nonexistent, with refinement in the method of analysis....

Reliability Methods for Steel Members Subjected to Axial Load and Moment
There has been a significant amount of research performed on determining the reliability of elastic-plastic frames where failure is through the formation of a plastic collapse mechanism....

Reduction of Imposed Loads for Beam and Column Design
Imposed loads on beams and columns are generally reduced to effect in economy in design. A study to evaluate the reduction criteria by evaluating the Equivalent Uniformly Distributed Loads...

Resolving Reliability Issues for an Offshore Platform Code
A fixed steel offshore platform design specification based on reliability concepts has been developed which could become an alternate to the existing working stress code, American Petroleum...

Reliability Study of Randomly Imperfect Beam-Columns
In this study, the effect of random initial geometric imperfections was treated as a set of equivalent random initial forces. This concept enables the direct employment of existing stochastic...

Steel Pipe Foundations for Deep Water
Four innovations are helping to make steel pipe piles more popular for foundations in deep water in Southeast Asia. Until recently steel was usually rejected for these applications, because...

High Strength High Rise
For the sixth time in history, a structure billed as the world's tallest concrete building (over 950 ft) is under construction in Chicago. The contractors describe the structure...

Building the Seven Seas
The Brookfield Zoo's Seven Seas Complex, outside of Chicago, is a combination of the Caribbean and the Pacific Northwest. Completed in May 1987, the Seven Seas Complex consists...

Planning for Rehabilitation?MWRA Waterworks System
The Massachusetts Water Resources Authority (MWRA) operates and maintains 255 miles of large diameter distribution mains. Existing problems include increasing steel pipe repairs and extensive...

Cables in Trouble
Having inspected more than half of the world's cable stayed bridges, the authors conclude that many are in danger of sudden collapse unless corrosion problems can be stopped....

Design/Construct Contract Speeds Bridge Job
In the name of time and money savings, Pennsylvania DOT is building a bridge using a modified turnkey contract. In contrast, the standard approach is first to design the bridge, then ask...

Rehabbing the Underground Railroad
The Park Ave. Railroad Tunnel brings three commuter rail lines into New York City's Grand Central Station. The four tracks occupy three tubes from 97th St. to 57th St., where...

Cable Stayed Bridges
Two of these five papers on cable-stayed bridges deal with wind analysis. One develops the theory for motion due to flutter and reaches the conclusion that the vibrations are, in general,...

 

 

 

 

Return to search