Defining the Infrastructure Problem?The Local View
The Governor's report defines infrastructure as 'the collective network of physical facilities and their maintenance necessary to sustain economic growth and...
The Pursuit of Quality: QA/QC
Quality assurance and quality control programs are mandated for many federally-funded construction projects. The private sector is also increasingly requiring such programs. The terms...
Deep Water Bering Sea Development Concepts
A brief description of the major environmental factors that a structure used to produce oil and gas in the deep water Bering Sea would have to cope with is presented. In particular, the...
Ice Forces on Port Structures Resulting from Moving Ships
Results are described of experiments carried out in Thunder Bay Harbour in March, 1984, to measure ice forces on a port structure. Ice forces were measured by installing five pressure...
Structural Considerations for a Radwaste Facility
The structural engineer needs to consider several criteria when designing a radioactive-waste processing facility in order to properly balance the requirements of safety and economy. This...
Nuclear Power Plant Delays: Probable Causes and Resolutions
The nuclear power industry in the United States is experiencing technological as well as construction and operation problems in nuclear facilities. It is the intent of this paper to review...
A Model for Nuclear Waste Shipping and Storage
A management option for spent fuel assemblies from nuclear power plants is storage in away-from-reactor (AFR) storage facilities. The purpose of this paper is to preseent a new mathematical...
Oconee Spent Fuel Rerack
Spent fuel storage problems facing electric utilities with nuclear generation are growing more critical as existing spent fuel storage capacity is utilized. Due to the inaccessibility...
Mixed Use, Mixed Materials
Tabor Center is a $330 million office/commercial/hotel complex in Denver's urban renewal area. The two block site is bisected by a street that had to be kept open during construction....
Shop Drawing Review: Minimizing the Risks
Individual designers, professional liability insurers, and professional organizations have tried to define the designers approval responsibilities for shop drawing review in clear, workable...
MBTA Red Line Extension Operating Plan
Completion of the MBTA's 3. 2 mile Red Line Rapid Transit Extension is scheduled for 1985. When completed, the seven year 574 million project will add three new stations to...
Quality Management in the US Army Corps of Engineers: An Evaluation
Quality management programs are employed to assure the achievement of specific standards of performance. In the construction industry, quality management personnel face common problems...
Avoiding Lengthy and Costly Litigation by Negotiating Alternative Dispute Resolution Methods
A 'hot issue' in the construction industry today is the negative aspects perceived from wide arbitration use over the last 15 years. Although hearings usually...
Summary of the Accomplishments of the Federal Rail Transit Vibration and Noise Control Technology Program
The U. S. Department of Transportation's Urban Mass Transportation Administration and Transportation Systems Center have played an active role in assisting the U. S. rail...
Noise Assessment, Measurement, and Mitigation, an OSHA View
A discussion is presented on the Occupational Safety and Health Administration (OSHA) 29 CFR 1910. 95 General Industry noise exposure standards and the 29 CFR 1926. 52 and 1926. 101 Construction...
Electric Utility Noise Emissions
Environmental regulations require that impact statements for new electric utility and industrial power plants include an evaluation of noise emissions. Variations in equipment sound power...
Environmental Noise Control for Industrial Facilities
The authors present a brief discussion of the criteria used to evaluate environmental noise control problems. Then, they discuss environmental noise control in the power, petroleum, gas...
Site Selection and Building Design for Minimizing Vibration
Over the last five to ten years, line resolutions required for state-of-the-art semi-conductor wafers have dropped to well below 1 micron. As a result, controlling environmental building...
Reshaping the Future of Plastic Buildings
Plastic structures have been around for 40 years, but have for the most part been showcases with little use in the mainstream of the building industry. To be used effectively, plastics...
Modeling of Microbially Active Soil Columns
A soil-based microbial treatment process for on-site treatement of hazardous industrial wastewaters has been developed. The indigenous microflora of the soil are supplemented by the addition...