Water Use Planning�Boston Harbor
This paper establishes a methodology for harbor planning based on comprehensively evaluating the water resource, categorizing the vessels which use the harbor, and prioritizing locational...
South Beach Harbor Project: Redevelopment of the San Francisco Waterfront
The redevelopment of a portion of San Francisco's Northern Waterfront is recounted, describing the planning and design process used to take an area of obsolete maritime facilities...
Waterfront Parks in the Boston Area
Two recently completed waterfront parks in Cambridge and East Boston, Massachusetts are discussed. The Bird Island Flats 'Harbor Walk' project is a 15-foot wide,...
Recent Trends and Advances in Bulk Cargo Unloading
The progress in loading of bulk cargo into ships has matched the advances in ships' size. The same could not be said for getting bulk material out of the hold of a ship, in...
Design and Construction of Marine Facilities for Ridley Island Coal Terminal
The design and construction of the wharf for 250,000 DWT bulk carriers is discussed in this paper. The terminal project was carried out on fast-track, 23 month schedule, with construction...
Improving Maintenance Performance
This discussion concerns Maintenance Management concepts that emphasize how the human element among Port personnel can be organized and efforts channeled so as to: increase the actual...
Modern Inspection Techniques n Port Maintenance
This paper addresses inspection of underwater structure of port facilities to acquire information which, when subjected to engineering analysis and confirmation, allows planning of short...
A Multi-User Fender Design and Installation
The increase in damage frequency to the existing Timber Fender System during the change-over from military to commercial/industrial users resulted in a call for design solutions from the...
Report of Task Committee on Drydock Design Criteria
This paper briefly summarizes the work carried out by a Task Committee on Drydock Design Criteria which was established by the Committee on Ports and Harbors. The Committee was established...
Planning for Deep-Draft Navigation Channels
This paper summarizes the trends in seaboard trade, the major commodities for the world, and the share captured by U. S. ports. The discussion includes the new developments of port planning...
Ship Wave Prediction for Port and Channel Design
Several laboratory and field investigations of ship-generated waves have been conducted during the past twenty-five years. Typically, for a given ship, reported data consists of the height...
Navigation Channel Design for Safe and Efficient Ship Transit
The U. S. Army Engineer Waterways Experiment Station (WES) recently conducted a hydraulic model investigation of the western portion of Cleveland Harbor, Ohio. This study provided data...
Los Angeles and Long Beach Harbors Tidal Circulation Study
Expansion of harbor facilities frequently involves placement of additional landfill and the deepening of channels and mooring areas. A numerical tidal circulation model was used in the...
Terminal 5 Renovation?Port of Seattle
The Port of Seattle is currently renovating its Terminal 5 facility on the west bank of the Duwamish River on the west side of Harbor Island in Seattle. This paper describes the methods...
Louisiana Avenue Wharf E: Rehabilitate the Existing Wharf into a Container Terminal
The Port of New Orleans is currently modernizing the existing facilities in order to handle the containerized cargos, therefore enabling it to compete with other ports located on the Gulf...
Rehabilitation of Wharf No. 8?Port of Houston
A routine inspection of wharves at the Turning Basin Terminal, uncovered evidence of extensive damage, including evidence that the 30-inch diameter steel pipe piles supporting Wharf No....
Puget Sound Alluvium: A Challenge in Design of Pile Supported Port Facilities with Dredged Slopes
The geotechnical investigation, evaluations, and recommendations for the Port of Seattle Terminal 18/20 Improvement Project are described and compared with observed performance during...
Geotechnical Considerations in the Design of the Wando Terminal Wharf Extension, Charleston, South Carolina
The South Carolina State Ports Authority (SPA) is currently examining construction concepts for the proposed 1,200-foot wharf extension and 40 acres of adjacent upland development at the...
Rehabilitation of Gravity Wharf by Underpinning
The Municipal Wharf at the Port of Providence, Rhode Island, is currently under rehabilitation to accommodate modern trends in marine cargo handling and shipping. The three-phased project...
Channel Design Criteria and the Houston Ship Channel
Channel design literature is reviewed and compared with operational limits currently on the Houston Ship Channel (HSC). It was found that in all aspects of channel design considered (depth,...