Project Control?The Next Generation
The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning...

Managing Government Contracts: Tips to Keeping Your Sanity
The key to managing large government projects is to divide it into smaller manageable pieces and organize it accordingly. Government projects are unique in that they require much more...

Glen Canyon: The Economic Costs
Revenues from power produced at Glen Canyon Dam are used to support Colorado River Storage Project (CRSP) purposes, to pay O&M costs, and to repay construction costs. Generation...

Wetland Engineering, Design, and Construction: State-of-the-Science and Research Needs
Local, state, and federal agencies, special interest groups, and individual landowners are undertaking wetland construction projects at a feverish pace to mitigate past and anticipated...

The West Point Story?Chapter 1: Overview and Planning
The West Point wastewater treatment plant is the Seattle metropolitan area's largest wastewater treatment plant, and it is being upgraded to provide secondary treatment. The planning,...

The West Point Story?Chapter 2: Project Management Approach
In 1985, serving as the program lead, Metro contracted with Lewis Zimmerman Associates to conduct a formal facility planning effort for the West Point wastewater treatment plant. It was...

The West Point Story?Chapter 4: Design
Metro's approach to design was one of integrated environmental and plant design. The project team, with guidance from the community and the city's parks department, established goals before...

The West Point Story?Chapter 5: Construction
As design of the West Point plant neared completion, the municipality of Seattle addressed construction of the facilities. The challenge was to build a complex wastewater treatment plant...

Assessment and Mitigation for Endangered Vernal Pool Invertebrates
The USFWS is considering declaring five species of vernal pool invertebrates endangered. Among these are the Vernal Pool Fairy Shrimp (Branchinecta lynchi), the California Linderiella...

Design of Pile Foundations
This handbook, Design of Pile Foundations, provides information on foundation exploration and testing procedures, load test methods, analysis...

A Structural Analysis System for Prestressed Concrete Bridges and its Application on the Interurban Express-Way Project in SEOUL
In this paper, the importance of the structural analysis in accordance with the construction progress was emphasized to accurately predict the structural behavior of prestressed concrete...

The 3D Approach to Design
Designing directly in three dimensions, including integrated analysis and information flow, is a powerful way to enhance civil engineering capabilities. Yet, relatively few have taken...

A Stochastic Cost Engineering System (SCENS) Applied to Estimating and Tendering for Bill of Quantities Contracts
In many countries, contracts based on bill of quantities are very common in construction industry. Although estimating and tendering are overwhelmed by uncertainties, the common practice...

Object-Oriented Modelling for Concrete Structures
The use of computers for the design process has reached wide acceptance. The use is developed in several fields such as CAD, CAM or programs for design of structural elements. Recent work...

Computing with Objects: What Does Industry Hope to Gain from it
Although the need for an integration of engineering tasks has been stressed for a long time, the success that we see in this regard is very limited. We believe that there is justified...

A CAD-Based Construction Simulation Tool Kit for Construction Planning
Current planning and scheduling techniques place considerable reliance on the planners judgement, imagination and intuition. The result of such techniques is typically lengthy text reports...

Knowledge and Information Processing with Drawing Objects in Construction Phase
Knowledge processing by CAD systems poses challenging problems for the efficient integration of design and construction processes. While CAD systems have been applied to various phases...

Computer Application in Analyzing Change Order Work
In heavy construction, particularly on large tunnel projects, numerous tasks are often performed and inspected simultaneously. The project specifications and contract documents require...

Information Integrated Construction (IIC)
The term 'INFORMATION INTEGRATED CONSTRUCTION (IIC)' was coined to describe the integration of construction information and practice through computer technology. We define information...

Comprehensive Site Monitoring Through Model Based Reasoning
The authors of this paper have developed a computer object oriented intelligent construction site modeler which is dynamically linked to a 3D CAD system. Model Based Reasoning is used...

 

 

 

 