Del Webb's Innovative Approach to Master-Planned Community Development
(No paper) The Del Webb Corporation is currently building a master planned development on the northern edge of Maricopa County. The development plan includes a water campus housing a water...
Retrofitting CSO Infrastructure in New Haven, Connecticut
(No paper) The City of New Haven Water Pollution Control Authority operates a wastewater collection and treatment system which serves over 130,000 residents in the cities of New Haven,...
Dynamic Groundwater Remediation Design with Genetic Algorithms
In groundwater remediation design it has been shown that dynamic policies, in which the pumping strategies may vary throughout the remediation period, can result in more cost-effective...
Optimization of the Aquifer Remediation Costs and Design with Pulsed Pumping
(No paper) Pump-and-treat is a common technique for the remediation of contaminated aquifers. However, slow kinetic mass transfer at sites contaminated with organic compounds may reduce...
A Risk-Based Approach to Subsurface NORM Disposal
(No paper) Naturally occurring radioactive materials (NORM) has become an environmental concern for the petroleum industry. NORM scales results when naturally occurring radium co-precipitates...
Risk-Based Corrective Measures for Waste Management Facility Closure
(No paper) In the past several years, risked-based corrective measure has been gradually accepted by federal and state agencies as a standard practice for site remediation or site closure....
Theoretical and Empirical Implications of Increasing Block Rates
(No paper) The U.S. Army disposed chemical agents, laboratory materials, and unexploded ordnance at the O-Field landfill from before World War II until at least the 1950s. Soil, ground...
Evaluation of Two-Species Model for Chlorine Decay and THM Formation under Rechlorination Conditions
(No paper) Typically, chlorine decay has been described by a first-order decay model. The first-order model, however, has two drawbacks: 1) the reactive species within the water is assumed...
The Tres Rios River Management Plan: The Result of Multi-Agency Partnering for Management and Restoration at the Confluence of the Salt, Gila and Aqua Fria Rivers
(No paper) The framework consists of a an Oversight Committee made up of Agency Department Heads, a Steering Committee comprised of local area Agency managers, and five Technical Committees:...
Title Transfer of U.S. Bureau of Reclamation Projects: Fact or Fiction
(No paper) The U.S. Bureau of Reclamation (Reclamation) has constructed hundreds of water storage and delivery projects throughout the 17 western United States. These projects vary in...
Using Indirect Potable Reuse to Provide New Water Supplies in Resource-Limited Regions
(No paper) Historically, water resources needed for potable use have been derived from readily-accessible surface and groundwater supplies of freshwater origin because such supplies can...
Progress and Future Direction to Improve Arizona's Reclaimed Wastewater Reuse Program
(No paper) The Arizona Department of Environmental Quality (ADEQ) is undertaking a major revision of its reclaimed wastewater reuse program in response to recommendations made by a citizens...
Reclaimed Wastewater Reuse in Arizona: Status and Vision for the 21st Century
(No paper) The Arizona Department of Environmental Quality (ADEQ) regulates the reuse of reclaimed wastewater through the issuance of individual reuse permits to treatment plants and/or...
City of Sedona Wastewater Reclamation Plant Upgrade: How to Teach an Old Dog New Tricks
(No paper) The City of Sedona's early 1990's wastewater treatment plant was difficult to control, prone to plant upsets, near capacity and often experienced on-site sewage spills. Additionally,...
Environmental Engineering '99
This proceedings,
Tunneling under Trains
The Singapore deep tunnel sewerage system consists of a 90 km long tunnel network that will convey wastewater by gravity flow to two new secondary treatment plants being planned for the...
Conquering the Cold
Three projects�a water treatment plant, an airport, and a hydroelectric plant�illustrate how practicing engineering in Alaska differs from working in the contiguous 48 states. Permafrost,...
Who Provides Inspection
With the increasing interest in the design-build project deliver system, the decision of who should be responsible for quality assurance/quality control has become a complex one. To assist...
Conquering the Mountain
Interstate 26 will be the largest and most expensive highway project ever undertaken in North Carolina. When completed in 2002, I-26 will provide safe and efficient interstate passage...
The Ultimate Challenge
The U.S. Department of Energy (DOE) has spent $2 billion and more than a decade studying the feasibility of constructing a nuclear waste repository inside Yucca Mountain in Nevada. The...
Return to search