Stepwise Flood Routing for Gated Reservoirs and Conjunctive Optimization of Hydroelectricity Income with Flood Losses
A six-stage operation policy for routing of flood hydrographs of return periods from 1.01 year up to the Probable Maximum Flood (PMF) for dams having gated spillways is suggested. The...

A Decision Support System for Assisting Operation of Artificial Recharge Systems
A series of simulation and optimization models analyzing artificial recharge systems have been linked within a decision support system (DSS) with a graphical interface. The model includes...

Title Transfer of U.S. Bureau of Reclamation Projects: Fact or Fiction
(No paper) The U.S. Bureau of Reclamation (Reclamation) has constructed hundreds of water storage and delivery projects throughout the 17 western United States. These projects vary in...

Water Resource Systems and Modeling of the Lower Virgin River Using EXCEL
(No paper) The first objective of this study was to determine the availability of water at the confluence of the Halfway Wash and the Virgin River and to simulate the diversion of river...

Underground Storage and Recovery: A Powerful Tool for the Management of the Limited Water Resources of the Phoenix Metropolitan Area
(No paper) The availability of imported Colorado River water to the Phoenix area in 1986 prompted the need for storage of the unused portion of each municipality's contracted allocation....

Putting Nature First
From salamander tunnels to hotels for red-legged frog, the $450 million Los Vaqueros dam and reservoir project in northern California put environmental concerns first in its planning and...

Geo-Engineering for Underground Facilities
The papers collected in this proceedings Geo-Engineering for Underground Facilities, summarize the practice of soil mechanics and engineering...

Towering Over Xiamen (Available in Structural Engineering Special Issue only)
Composite structural systems are rapidly becoming the preferred choice for high-rise buildings, due to their high strength and stiffness, large ductility, and convenient, economical construction....

Easy Interface
Engineers have long desired to be able to move freely from computer-aided design (CAD) programs to geographic information systems (GIS) and their vast databases. Now, thanks to improvements...

When the Levee Inflates
Rubber dams�long, flexible tubes, anchored to a concrete base and abutments and inflated with air or water�have been used since the 1950s, but installations have risen as technology has...

Interest in Deposits (available only in Geoenvironmental Special Issue)
Sediment accumulating in reservoirs worldwide is gradually reducing storage capacity, posing a long-term threat to supplies of drinking and irrigation water. The buildups also highlight...

Out of Sight, Out of Time
A 10-year grace period for complying with an EPA regulation mandating that all underground storage tanks have spill, overfill and corrosion protection runs out on December 22, 1998. Hundreds...

Pump-and-Treat Rescue
The pump-and-treat method of remediation has been regarded for years as unsuccessful and untrustworthy. But a recent project in Chicago showed that in conjunction with horizontal wells...

Light Rail as Planned
The Mission Valley West project, an extension of the San Diego Trolley, runs 6.1 miles between Qualcomm Stadium and the Old Town District. Conceived by the Metropolitan Transit Development...

Scheduled Departure
A busy, growing international airport constructs a new international terminal with upper and lower level access roads and expands its parking garage without interrupting services. The...

Federal Triangle Finale
At 3.1 million sq ft, the Ronald Reagan Building and International Trade Center is the second largest U.S. federal building ever constructed; only the Pentagon is larger. After more than...

Solid Footing (available in Geoenvironmental Special Issue only)
The new $500 million Arrowhead Regional Medical Center in San Bernardino, Calif., sits near two fault lines. The importance of the facility and the sensitivity of the area made seismic...

Shoring Up Lake Shore Drive
A $101 million roadway relocation project in Chicago, winner of a 1998 Outstanding Civil Engineering Award (OCEA) of Merit, reunited the north- and southbound lanes of Lake Shore Drive...

The San Francisco Connection
An underground switchyard and storage facility for San Francisco's Municipal Railway challenged the limits of both cut-and-cover and tunneling in loose soil. The project was...

The Deep (Available in Geo-Environmental Special Issue only)
Despite a mere 1,500 ft separation, Baltimore's Oriole Park at Camden Yards and Ravens Stadium required vastly different deep foundation solutions. While Oriole Park is founded...

 

 

 

 

Return to search