Groundwater Modeling - A Management Tool
A hydrogeologic investigation within the South Mountain Complex of south central Pennsylvania was performed to develop a groundwater management program. Using LandSat imagery, low altitude...

Database Management Systems for Urban Facilities
This paper discusses design and implementation issues associated with the development of database management systems (DBMS) for urban facilties. Many of the experiences described here...

Blue Marsh?A Modular Hydroelectric Project
The Blue Marsh Hydroelectric Project will be the first complete application of concepts developed in several research studies of modular hydroelectric power plant components. The Department...

Rehabilitation of a Pump/Turbine
Between 1964 and 1968, eight 212 in pump discharge diameter Baldwin-Lima-Hamilton vertical pump/turbines with Westinghouse motor/generators were installed in Philadelphia Electric Company's...

Computer Modeling for a Power Intake
This paper describes the application of an existing computer model to respond to environmental requirements for a small scale hydroelectric power plant being developed by Allegheny Electric...

Upper Delaware River Ice Control?A Case Study
During February 1981 a castastrophic breakup ice jam occurred along a reach of the Delaware River near Port Jervis, NY, causing 14. 5 million in damages. In February 1982 another breakup...

Tort Liability in the Pennsylvania Department of Transportation
During the past decade many have questioned the propriety of the doctrine of sovereign immunity; numerous legal challenges and legislative changes have eroded the doctrine in most states....

Settlement of a Reactor Containment on Sand
In this paper, predicted and observed settlements are presented for the reactor containment structure of the Beaver Valley Power Station - Unit 2, Shippingport, Pennsylvania. The Beaver...

Evaluation of Landfill Leachate Recirculation
The effectiveness of leachate recycle as a leachate management technique has been evaluated at a landfill in central Pennsylvania where recirculation has been practiced for seven years....

Real-Time Precipitation-Snowmelt Model for the Monongahela River Basin
The Pittsburgh District, U. S. Army Corps of Engineers, is responsible for operating two multipurpose reservoirs in the 7400 square mile Monongahela Basin, which is located in Pennsylvania,...

Scheduling and Cost Control for the Pittsburgh LRT
Like most American cities, Pittsburgh has had a long history of public transportation utilizing street cars. Conversion to a modern light rail transit (LRT) system will occur in two stages,...

Philadelphia Center City Commuter Connection
The Philadelphia Center City Commuter Connection, a 330,000,000 urban transit project has been completed on schedule within a budget variance of 2% of the estimated cost. This is an accomplishment...

Microcomputer Application in Predicting Upland Erosion
An erosion-deposition model, originally developed for a mainframe computer, was adapted for an Apple IIe. With minimal adjustment it can also be used on other personal microcomputers....

Maintenance Management for a Large Urban Waterworks System
The Boston Water and Sewer Commission (BWSC) owns and operates a water distribution system consisting of 86,000 customer accounts and 1,100 miles of water mains. In 1984, BWSC initiated...

Ocean Dumping at the Philadelphia Site; A Case Study
This study reviews the results of eleven years of investigation of the impact of ocean disposal of sewage sludge at the Philadelphia dumpsite. The site, located on the continental shelf...

The Tunnel That Transformed Philadelphia
The 1985 Outstanding Civil Engineering Achievement is the Center City Commuter Rail Connection, a 1.7 mile tunnel connecting two former stub-end railroad stations in Philadelphia. The...

City of Pittsburgh Horizontal Elevator Experience: A Unique Application
The City of Pittsburgh is developing a unique and innovative application of horizontal elevator technology for use as downtown people-movers. The paper reviews the horizontal elevator...

Nine Years' Service with Deep Polymer Impregnation
A test installation of deep polymer impregnation was applied to a heavily traveled bridge deck in Bethlehem, Pennsylvania, in 1975. The deep polymer impregnation process involved drying...

Analysis of Cracking of I79 Bridge at Neville Island
A large crack was discovered to form in a girder of the I-79 Glenfield Bridge over the back channel of the Ohio River near Pittsburgh on January 28, 1977. A section of the girder containing...

Management of Microcomputers in PennDOT A Perspective on Managing Training
The Pennsylvania Department of Transportation is in the midst of a 63 million dollar 'Plan to Achieve Leading Edge Status in Electronic Data Processing. ' This...

 

 

 

 

Return to search