Fish Studies for a Small Hydroplant in Michigan
The Morrow Lake hydroelectric project is a new facility which is scheduled to become operational in August 1985. A study has been developed consisting of two main parts: Potential change...
A CM Multiple Contracting Cost Model
The original purpose for construction management was cost savings through time savings and efficient operations. As the CM system expanded in use and scope of services other very significant...
Reflections on Racine's Rebound
The existing harbor in Racine has approximately 110 acres of water surface bounded on the north and south side by one-half -mile long concrete breakwaters and on the west by the city....
Revitalization of Urban Water Supply and Distribution Systems: Detroit and Phoenix Case Studies
In 1980 the people in the Detroit Water and Sewerage Department were asking themselves the kind of question that is facing the managers of many municipal utilities in this country these...
Planning Aspects of the Woodward Corridor LRT Preliminary Engineering Project
The efficient deployment of any major project requires careful planning of the management, scheduling and budgeting activities associated with its implementation. The Woodward Corridor...
Numerical Modeling of Groundwater-Lake Systems
Groundwater inflows can have important effects on the chemistry and biology of a lake ecosystem. For example, studies of lakes in Northern Wisconsin documented localization of ferromanganese...
Estimating Wastewater Capacity of a Cedar Swamp
The response of water table to rainfall provided the basis for estimating the wastewater capacity of a northern Michigan cedar swamp which had been used for disposal of 30 million gallons...
Factors Influencing Oxygen Depletion in Green Bay
Dissolved oxygen depletion in the lower Fox River (Wisconsin) and Green Bay (Lake Michigan) have historically been tied to discharges of organic matter from municipal waste treatment plants...
Low-Cost Stacked Block Revetments for Great Lakes Shores
Two stacked-block revetments, the product of emergency conditions and budget limitations, were constructed at Illinois Beach State Park on Lake Michigan in April 1982. The revetments,...
Feasibility Assessment, Planning and Programming of Downtown People Mover Installations
Based on the author's personal experience, this paper sets forth suggested guidelines for progressing from initial feasibility studies through implementation of automated...
How Will People Movers Affect Downtown Areas?
The year 1980 was a pivotal one for the downtown automated people mover development process in both Detroit and Miami. In that year both cities completed their preliminary engineering/environmental...
Urban Experience with AGT in North America
This paper gives a brief historical review of events behind the four Automated Guideway Transit (AGT) system deployments which are approaching public operations during 1985 and 1986. Particular...
Safety Aspects of Detroit DPM Station Designs
The Detroit Downtown People Mover (DDPM), currently under construction in the Central Business District of downtown Detroit, offered a unique set of challenges to the architects and engineers...
Unique Considerations in the Detroit DPM Foundation Design
Foundation design for the guideway of Detroit's Downtown People Mover (DPM) was influenced by a variety of unique considerations. Severe loading conditions were created by...
Unique Features of Automated People Mover Systems
This paper identifies the characteristics and unique features of the automated transit system presently being installed in the central business district of Detroit, Michigan. This system...
Downtown People Mover System Security: Detroit and Miami Responses
The Detroit and Miami downtown people mover (DPM) systems will be in uncontrolled environments in major urban central business districts. Both plan not to have personnel on vehicles or...
Detroit's DPM Maintenance and Control Facility
The Maintenance and Control Facility (MCF), a single building complex for the Detroit Downtown People Mover (DPM) system, incorporates the people mover system's transit vehicle...
Downtown People Mover Operating and Maintenance Personnel Requirements
Two major automated Downtown People Mover (DPM) projects, Miami and Detroit, are expected to be in operation within a year. These two DPM systems are similar in many respects: automation,...
Flint Tunnel?A Project of Change and Challenge
The talk will deal with construction of a 12' diameter (8. 5' finished) tunnel in the City of Flint, Michigan. This 5-mile long sewer tunnel was constructed through...
Foundation Design Considerations for Detroit DPM
The design loadings for support of the elevated guideway of the Detroit Downtown People Mover (DPM) consist of high vertical as well as horizontal loads. In order to simplify foundation...