Strategies for Developing Major Capital Facilities
Siting, permitting, and mitigating impacts present many challenges during the development of major capital facilities. As a result of the need for public involvement, environmental review,...
The West Point Story?Chapter 1: Overview and Planning
The West Point wastewater treatment plant is the Seattle metropolitan area's largest wastewater treatment plant, and it is being upgraded to provide secondary treatment. The planning,...
The West Point Story?Chapter 2: Project Management Approach
In 1985, serving as the program lead, Metro contracted with Lewis Zimmerman Associates to conduct a formal facility planning effort for the West Point wastewater treatment plant. It was...
The West Point Story?Chapter 3: An Integrated Park and Treatment Plant
The West Point Wastewater treatment plant in Seattle sits on a small parcel of land that juts out into Puget Sound. In 1984, controversy erupted when Seattle Metro recognized that West...
The West Point Story?Chapter 4: Design
Metro's approach to design was one of integrated environmental and plant design. The project team, with guidance from the community and the city's parks department, established goals before...
The West Point Story?Chapter 5: Construction
As design of the West Point plant neared completion, the municipality of Seattle addressed construction of the facilities. The challenge was to build a complex wastewater treatment plant...
Low Flush Plumbing Fixtures and Wastewater Systems
The significance of low flush plumbing fixtures on the wastewater collection and treatment system serving a small community has been determined. Among the concerns studied were: functional...
Use of a Statistical Model to Forecast Future Wastewater Flows
Future wastewater flows are generally predicted based upon an assumed rate of population and industry growth within a treatment facility's area of influence. In a community with limited...
Challenges in Implementing the Use of Reclaimed Water
The State of Washington is currently in the process of adopting standards for use of reclaimed water on land. CH2M HILL recently has finished two feasibility level studies for reuse projects...
The City of Los Angeles Gray Water Pilot Project Shows Safe Use of Gray Water is Possible
A year-long study of eight residential gray water systems was conducted in the City of Los Angeles. Soils irrigated with gray water were compared monthly with soils irrigated with municipal...
Bellingham Frozen Foods Spray Irrigation System Operations
Bellingham Frozen Foods is a major vegetable processor located in northwestern Washington state. During the mid-1980's, the city of Bellingham began to upgrade the treatment of wastewater....
Implementing a Watershed Plan for Lake Stevens
The water quality of Lake Stevens is declining because of watershed nonpoint pollution and cycling of nutrients from lake sediments. Hypolimnetic aeration and an alum treatment are proposed...
Design of Aquatic Treatment Systems
This paper describes the design parameters and operating procedures used for a nonpoint pollution/stormwater treatment facility known as an Aquatic Treatment System to be located in the...
Urban Runoff Considerations in the Design of Wastewater Management Programs for Coastal Areas
The continuing increase in the population of the nation's coastal areas is placing additional stress on coastal aquatic systems faster than it can be reduced through improved wastewater...
Storage/Treatment Isoquants for CSO Control Planning
A quantitative procedure which identifies the technically efficient combinations of storage volume and treatment rate necessary to achieve various levels of combined sewer overflows (CSO)...
The Kettering Community Demonstration Project Non-Point Pollution Control and Environmental Enhancement Program
With the advent of the U.S. EPA's municipal/ industrial NPDES and Coastal Zone Management programs the development of effective non-point pollution control programs has become the most...
Storm Water Management in the Greater New Orleans Area
Two parishes, Orleans and Jefferson, located within the Greater New Orleans area have been identified by EPA as urbanized areas requiring storm water permits. Storm water management has...
Storage of Combined Sewer Overflow: How Effectibe is it Anyway?
The purpose of this paper is to illustrate the importance of modeling long term rainfall records to evaluate the effectiveness of combined sewer overflow storage. This paper will present...
Case Study: Storm Water Analysis of Manatee Pocket in Martin County, Florida
storm water pollutant loading rates from a 6,000 acre urban watershed were analyzed for source determination of contamination to the receiving water. The receiving water body, Manatee...
Dynamic Analysis and Design Considerations for High-Level Nuclear Waste Repositories
This proceedings,