Machine Learning in Civil Engineering ? Important Issues and Challenges
In recent years, machine learning techniques have been applied to help overcome the knowledge acquisition bottleneck of knowledge-based systems in civil engineering. This paper identifies...
Towards Practical Machine Learning Techniques
Most research on the application of machine learning to engineering problems have solved artificial problems. While research claimed to have reached results that would improve practice,...
Automated Design of 3-D Highway Sign Bridge Structures
A PC-based computer analysis/design program for 3-D Sign Bridge Structures including Pre- and Post-processor has been developed. The analysis of thirty different types of sign support...
How do Integration and Data Models Add Value to a Project?
Integration has been at the forefront of research agendas of universities and restructuring efforts of companies in the past few years. However, we are still lacking a common understanding...
Modeling Initial Mixing of Ocean Wastewater Discharges to Develop Toxic Effluent Limitations
The UM model, released by USEPA in 1992, was utilized to simulate the initial mixing of a discharge to the Atlantic Ocean near Ocean City, New Jersey. The study included field verification...
Adaptive Instructor Model for an Engineering ITS
To develop intelligent tutoring systems (ITS) for engineering via computer technology, a model of how engineers learn as well as methods in which instruction should occur must be captured...
Microworlds for Learning Through Inquiry
We discuss several computer-based environments to support learning through inquiry, called microworlds, including two focused on steam power plant operation and electronic troubleshooting....
Empirical Performance Comparison for Symbolic and Subsymbolic Learning Systems
The paper gives a description of a comparative study of two learning systems based on symbolic and subsymbolic learning. The two systems' performance was analyzed using the overall empirical...
An Interactive Computer Code for Generations of Artificial Earthquake Records
A new interactive computer code is presented in this work for the calculation of artificial earthquake records that comply with any arbitrarily specified target response spectra or power...
GIS Modeling of Neo-Traditional Neighborhood Development
Emerging strategies for land use development suggest that neo-traditional neighborhoods promote increased accessibility with reduced traffic congestion compared to current suburban developments....
A Knowledge-Intensive Database System for Making Effective Use of Construction Lessons Learned
The Constructability Task Force of the construction Industry Institute (CII) sponsored as series of studies which advocate construction expert input to the conceptual planning, engineering...
Creating and Abstracting Lessons-Learned from BCO Reviews
This database allows reviewers searching for relevant past expertise access to a relatively small set of comments that have been retained frequently for past reviews. The ability to order...
Three-dimensional Modeling for Improving Construction Process Performance
This paper presents experimentation regarding a model for deciding the optimum number of resources that should be allocated to a project. Measures of task and process flexibility are used...
Alternative Decisions for Space-Based Scheduling in Multi-Story Projects
SCaRC (Space-Based and Resource-Based) is a prototype knowledge-based scheduling system that acknowledges work space as a scheduling constraint. The SCaRC system comprises different scheduling...
MoveCapPlan: In Integrated System for Planning and Controlling Construction Material Laydown and Handling
This paper focuses on modeling and improving flow. It presents a computer-based system for planning and controlling construction material laydown and handling. This system, named MoveCapPlan;...
Time-Space Tradeoff Strategies for Space-Schedule Construction
Space availability on a construction site can have a major impact on the efficiency and constructability of a project. Especially when space is limited, tradeoffs between activity sequencing,...
Integrated Product Models
A review is made of current STEP standards efforts to develop integrated product models, using the Express language. An example of a building wall is presented, along with some general...
Automatic, Remote, Multiplexed Geotechnical Measurements with Time Domain Reflectometry (TDR)
Time Domain Reflectometry (TDR) has been employed successfully in geotechnical applications such as monitoring of rock mass deformation in a variety of geometries; however, required operation...
Application of the FESWMS-2DH Software to Solve the Navigation Problem at EL-Menya Bridge in Egypt
The purpose of this paper is to introduce the application of a two-dimensional Finite Element Surface Water Modelling System on a navigation problem located along the Nile river in front...
Use of Database in Geo-environmental Engineering
Geo-environmental projects are becoming increasingly complex requiring rigorous mathematical computation and analysis of large amounts of data. This paper looks into how a geo-environmental...
Return to search