Earthquakes: A New Look at Cracked Masonry
Economics, fears of liability, and a strict damaged-buildings repairs ordinance have contributed to an extensive delay in the repair of masonry-infill buildings in earthquake-stricken...

Tensile Terminal
Few can miss a fabric roof that covers a 1.45 million sq ft area. The one covering the Denver International Airport's Landside Terminal complex (reportedly the nation's...

Dome Over Orlando
The article describes Orlando's new City Hall, a 267,000 sq ft nine-story reinforced concrete tower, clad in granite-aggregate precast concrete panels and topped by a 120...

School Is In Session
Cost overruns, project delays and the city bureaucracy have given school construction a bad reputation throughout the U.S., particularly in urban centers. But as other construction markets...

Numerical Analysis of Frost Shields
The term 'frost sheilding' has been used to describe the practice of using flat stock rigid insulation materials burial above a water or sewer pipe to reduce...

Impact of Cold Weather on Building Construction Scheduling
Weather impact on a building construction schedule is often significant in cold regions. Most deterministic scheduling methods are unable to directly account for the effects of weather...

Processed-Snow Foundation Design at the Summit of the Greenland Ice Cap
The design and construction of a processed-snow foundation berm for an elevated building located at the summit of the Greenland Ice Cap is described. Weather conditions and design provisions...

Environment One: A Master Plan Study for a New Scientific Research Station at the Geographic South Pole
The existing research station at the geographic South Pole is approaching the end of its useful life. This master plan study focuses on determining the technical and functional requirements...

Cold Climate Building Research at Wasa Base, Antarctica
During the Antarctic summer season of 1988-89 a permanent Swedish research station was erected at Dronning Maud Land, Antarctica. The station, named Wasa, is situated on a nunatak. A corresponding...

Use of Rigid Insulation Below Grade for Roadways and Parking Areas
Minnesota Power's Herbert Service Center is located 3 miles north of downtown Duluth, Minnesota. The facility, constructed in 1967, consists of primary buildings, cold storage...

White Steel for Osaka Bay
Wind, earthquake and aesthetics were the design determinations for Japan's Higashi-Kobe Bridge. The designers also had to consider the man-made bay infill site and a directive...

Houston Moves Forward Again
The National Transportation Plan, as released by Transportation Secretary Samuel Skinner, advocates the construction of toll roads and calls on local governments to devise and finance...

Retrofitting Existing Fossil Plant Facilities
This paper summarizes the contents of and provides some insight into the usefulness a structural engineer will get from the publication 'Retrofitting Existing Fossil Plant...

A Biographical Dictionary of American Civil Engineers
This publication A Biographical Dictionary of American Civil Engineers - Volume II supplements the first volume of this biographical dictionary...

The Growing Meet Market
The Delaware cities of Dover and Wilmington are only 5 mi apart. Their combined populations barely exceed 100,000. Yet each city is planning to build a new convention center to corner...

Making the New Look Old
Between March 1990 and January 1991, Annapolis buried overhead utilities and reconstructed the roadway around the historic State House, built in 1769. The paving stones, colonial-appearing...

Jailhouse Design
According to statistics from national corrections groups, the inmate population in the U.S. has reached 1 million and could double by 1995. With the constant need for more beds, engineers...

Structural Approximations in Multi-Story Buildings
Simplified computer analyses and various approximate hand calculation methods are extremely valuable in structural engineering for multi-story buildings both during the preliminary design...

Wind Frame Design for Mid Rise Buildings
A brief discussion of drift limits is followed by design procedures for unbraced moment resisting wind frames and initial selection of optimized member sizes for chevron bracing frames....

Approximate Preliminary Methods for Design of Lateral Load Resisting Systems in High Rise Buildings
A new group of optimization programs uses the speed and power of modern computers to eliminate the need for guessing preliminary sizes. Starting with any arbitrary sizes and a fixed geometry,...

 

 

 

 