Project Management and UMTA
This paper examines the scope of project management of public transport projects from a 'macro' viewpoint. To imrove the effectiveness of the management of an...

Coordination and Control - Staff, Consultants and Participating Agencies for Sacramento Light Rail Transit Project
The Sacramento Light Rail Transit Project is an 18. 3 mile (29. 5 Km) line, primarily at-grade, which provides the trunk line service for an integrated Bus/LRT public transportation system...

Alternatives Analysis?Its Role in Public Transit
The Urban Mass Transportation Administration's first major urban mass transportation investments policy statement was issued in 1976. The policy was revised and updated in...

Organization for Rapid Transit Design and Construction
This paper discusses organizational arrangements for design and construction of rapid rail transit systems and the advantages and disadvantages of the various organizational arrangements....

Philadelphia Center City Commuter Connection
The Philadelphia Center City Commuter Connection, a 330,000,000 urban transit project has been completed on schedule within a budget variance of 2% of the estimated cost. This is an accomplishment...

Budget and Schedule Control?The Critical Issues
The increase of activity together with often difficult budgets and schedules in busway and rail transit projects since 1960, has made the processes of project control for these projects...

Validation of SWRRB?A Simulator for Water Resources in Rural Basins
The three major components of SWRRB are weather, hydrology, and sedimentation. Processes considered include surface runoff, return flow, percolation, evapotranspiration, transmission losses,...

Urban Hydrology for Small Watersheds (Revised 1985)
Urban Hydrology for Small Watersheds, Technical Release 55, was first issued by the Soil Conservation Service in January 1975. It is a guide for SCS field personnel for estimating hydraulic...

A Giardia Source Investigation in a National Forest Municipal Supply Watershed
For nearly 100 years, the City of Missoula, Montana, obtained most of its municipal water from a surface water supply, Rattlesnake Creek. The Rattlesnake watershed lies within the Lolo...

Cyanide Heap Leaching Problems at Elk City, Idaho
A cyanide heap leaching operation for gold recovery was started in 1983 above the water intake for the community of Elk City in north central Idaho which turned into a problem during the...

Noise Characteristics of Alternative Urban Transit Technologies
The noise characteristics of alternative transit technologies for an urban area are summarized. Among the transportation technologies considered are a busway system, light rail transit...

A Tale of Six Cities
Battle Creek is a four mile urban stream that had an erosion problem that was accelerating with urbanization of its watershed. Erosion created unstable ravine slopes over 60 feet high,...

Innovative Strategies to Improve Urban Transportation Performance
The field of urban transportation is facing some severe challenges. Roadways continue to deteriorate, the financial condition of public transit systems is abysmal, and general productivity...

Use of Spreadsheets in Stormwater Modeling
The use of microcomputers is becoming more and more prevalent in both large and small design offices as their first cost continues to decrease, as their capabilities continue to increase,...

Design and Operating Rules for Reservoir Storage to Offset Future Consumptive Use
The Washington Metropolitan Area (WMA) relies largely on the Potomac River for water supply. After many years of study, a coordinated regional operating plan was adopted by the water supply...

Modeling a Water Distribution System
Problems encountered in modeling the water distribution system for the City of Norwich, NY are discussed and the procedures used to solve each problem are described. The interpretation...

Real Time Control of Combined Sewers
After an introduction on the scope of urban drainage and water pollution control problems static solution approaches are shortly described and their disadvantages are lined out. The potential...

Integrated Design Methodology for Urban Stormwater Detention Facilities
The objective of this paper is to present the core of a design methodology that avoids the pitfalls of the design storm concept by using a microcomputer algorithm to estimate the long-term...

Practical Water Demand Forecasting
The authors describe their experience in designing, building, and applying a water demand forecasting model for the Denver metropolitan area. In the presence of incomplete and sometimes...

The SRI Technique for Flood Frequency Analysis
This paper presents a technique for flood flow frequency analysis called the Storm Response Index (SRI), and a case study using the technique. The SRI method is based on the development...

 

 

 

 

Return to search