Future Needs for Unsteady Flow Canal Models
The ASCE task committee on 'Irrigation Canal System Hydraulic Modeling' examined a number of the computer programs available for simulating unsteady open-channel...

Irrigation Delivery Design with Parameter and Objective Uncertainty
This paper investigates the effects of uncertainty in the design of hydraulic structures in an open-channel system for irrigation water delivery. Uncertainty due to ambiguity in the values...

Predicting Incipient Fluidization of Fine Sands in Unbounded Domains
Fluidization systems in the coastal environment consist of a water pumping system and a source pipe buried in or near a tidal inlet to maintain a channel or to aid in sand bypassing. If...

Measurement and Analysis of Hydraulic Conductivity Variability of a Heterogeneous Aquifer
The spatial variability of hydraulic conductivity of a shallow alluvial aquifer was investigated using borehole flowmeter measurements. The study was conducted at the site of a large-scale...

Type Curves for a Slug Test in an Infinitely or Semi-infinitely Thick Aquifer
Type curves are provided for a slug test in an infinitely or semi-infinitely thick aquifer, the latter with the single confining layer immediately above or immediately below the well....

Application of Decision Analysis in Groundwater Remediation Design
The design of groundwater remediation systems involves selecting from a set of design alternatives under conditions of uncertainty. A risk-based decision analysis approach is presented...

Aquifer Measurements at Different Scales
Multilevel slug test data from five wells in a confined, sandy aquifer were analyzed to obtain an estimate of the vertical variation of the horizontal hydraulic conductivity, K(z). Hydraulic...

Application of Tracer Tests in Groundwater Remediation Design
Recent advances in the area of field testing for the quantification of hydraulic conductivity have resulted in improved site characterization of aquifer hydraulics and greater reliability...

Buoyant, Miscible Plume in Heterogeneous Aquifer
A three-dimensional, particle tracking scheme is used to compute the trajectory of and spread about the centroid of a mass slug added to steady flow through an infinite aquifer with an...

Potential Effects of Global Climate Change on the Central and Southern Florida Project
The possible impacts of some potential climate change effects such as sea level rise, changes in tropical cyclone intensity and frequency, and changes in precipitation and temperature...

Sediment Transport Measurements in the Nile River at Bani Mazar
Measurements of sediment transport on the Nile River were conducted at Bani Mazar (200 km South of Cairo) during high and low water stages. Bed-load and suspended-load transport rates...

Movable-Bed Model to Evaluate Nile River Dredging
About 200 km south of Cario, at Bani Mazar reach, the Nile River has widened and formed several islands. The result is three channels with shallow depths. One of the branches must be improved...

Application of Stable Channel Design Method
Systematic stable channel design methods are currently being developed by the US Army Engineer Waterways Experiment Station for use in the planning stages of local flood control projects....

Hydraulic Aspects of Grade Control Structures
This paper describes the function of grade control structures. The primary purpose of a grade control structure is to maintain or establish a desired bed elevation in a channel. Basically...

Bed Load Roughness in Supercritical Flow
A supercritical concrete channel is proposed for Mission Creek located in Santa Barbara County, California. The proposed channel may transport gravels and cobbles as bed load during large...

Riprap Design Criteria for the ARS Low Drop Structure
The ARS low drop grade control structure has proven to be an effective means to stabilize incised channels in Mississippi. However, field inspections and laboratory testing have indicated...

New Lessons About the Hydraulic Performance of Highway Storm Sewer Inlets
Laboratory experiments were performed with highway storm water curb inlets to 1) reduce the oblique standing wave that extends into the highway from the downstream side of the inlet and...

Stepped Spillway Design for Flow Over Embankments
Many embankment dams have been identified as unable to pass their design flows without failure due to overtopping. The U.S. Bureau of Reclamation (Reclamation) is currently at the forefront...

Overtopping Flow Spillway for Baldhill Dam, Sheyenne River, North Dakota
An existing gated spillway structure for Baldhill Dam and Reservoir (Lake Ashtabula, North Dakota) is not capable of passing floods up to the probable maximum flood (PMF) without overtopping...

Fluidization Pipe Hole Spacing
Two-dimensional fluidization experiments are performed on fine (d50 = 0.15 mm) and medium coarse (d50 = 0.45...

 

 

 

 

Return to search