Capturing As-built Project Information for Facility Management
Complete, accurate, and timely provision of as-built information plays a critical role in the optimal upkeep of a facility. Facility operators/maintainers usually are delivered a constructed...
Analysis of I-Girder Highway Bridges
Analysis of a bridge superstructure is complicated by the general geometric and loading conditions. Presented in this paper are three dimensional finite element modeling techniques used...
An Assessment of the Joint Factor as Used in the Modified MEXE Method
The finite element method has been used to examine the joint factor in the modified MEXE method which is documented in the publications (BD21/93 and BA16/93) by the Department of Transport...
Impulse Effect on Redundancy of a Tied-Arch Bridge
This paper studies the redundancy of a tied-arch bridge using a 3-dimensional finite element computer model. By using static incremental loading simulation, a tied-arch bridge designed...
A Decision Support System for the Expansion of International Operations of A/E/C Firms
The changing trend of the construction industry will require A/E/C firms to consider expanding operations in the international construction market arena. This paper presents a conceptual...
An Integrated Computer Model for Project Schedule Updating
Current schedule updating techniques rely mainly on field reports to specify completed work. Information provided in these reports are then manually summarized, analyzed, and input to...
Overlaying Digital Images with 3-D CAD to Document as Built Construction
A persistent problem in construction has been documenting changes which occur in the field and preparing as-built drawings. The accuracy and completeness of field measurements is often...
Graphic Visualization for Planning Heavy Lifts
The application of graphical visualization to construction can serve a wide variety of objectives and offers many significant benefits. Heavy lifts are an important component of industrial...
Building Product Model, A First Brick in Computer Integrated Construction
This paper describes the development of a product model as a basis for an information system. This new approach is based on modelling functions of building units rather than physical entities...
Developments to the IRMA Model of AEC Projects
The rapidly advancing fields of information technologies (IT) for AEC and computer-integrated construction (CIC) rely on the ability to represent and exchange information about AEC projects...
Information Modeling and Applications
The objective of this paper is to describe events and findings in the development of a comprehensive information architecture for a building. The information architecture has a goal of...
Transactional Support for Concurrent Finite Element Analysis & Design
The finite element (FE) analysis and design process deals with large amounts of complex engineering data. Although sophisticated techniques have been developed for computer-aided FE analysis,...
Hybrid Finite Element/Discrete Element Model for Large Deformation Geotechnical Engineering Problems
New hybrid finite element/discrete element computational code was developed for large deformation geotechnical engineering problems with granular materials. The code uses the finite element...
Analysis of Port Allen Lock in Elastic-Plastic Soil Medium
Incremental finite element analyses using Drucker-Prager plasticity model are applied to study the interaction of Port Allen Lock with its surrounding soil. The analyses not only consider...
Machine learning Applications for Automated Constructability Reviews
Knowledge acquisition of the project design and construction site conditions is essential for determining construction project complexity. An effective knowledge acquisition method is...
The Development of an Expert System Used in Preliminary Design of Concrete Bridges
The importance of the selection of the best design on the one hand and the available knowledge, on the other during the preliminary design process asks after a different kind of software...
Time-related Deflections of Cantilever Bridges
Many prestressed concrete bridges with spans between 100 and 160 m have been built in the Netherlands. The method of construction is the so-called in situ free cantilever construction....
An Artificial Neural Network Approach to Allocating Construction Resources
This paper presents an approach to alleviate the problem of depending upon human expert in allocating construction resources. This approach is using artificial neural networks to capture...
SELECTCRANE: An Expert System for Optimum Crane Selection
Every major project undertaken today requires the services of a crane(s) to ensure that all materials and equipment hoisting and placement are performed in the most efficient manner. The...
Construction Expertise Transfer with Knowledge Based Systems
The experience held by a cost estimating engineer is a valuable asset in every construction company. For a reliable cost estimation at the conceptual stage of a building project, the missing...
Return to search