Physical Hydraulic Modeling for a Small Hydroelectric Redevelopment
In the development of a small hydroelectric project, the operating head on the plant is usually limited. On these projects, the need to minimize head losses and eliminating other factors...

Realistic Hydrology for Basin Management
Several realistic yet simple methods to describe infiltration, soil moisture redistribution, aquifer recharge, canal seepage and stream-aquifer interaction in a river basin are presented...

Modeling Analysis for Management of Artificial Recharge
The objective of these groundwater and sediment modeling studies is to determine the net change in storage and potentiometric levels within the Bunker Hill Groundwater Basin resulting...

Increased Reservoir Cost to Meet Instream Flow Needs
Low flow criteria need to be developed for determining the suitability of various low flow regimens for fish and wildlife. For choosing a desirable low flow release, the decision maker...

Information Retrieval Sources and Availability in Hydraulics
There is a very general unawareness of information available on hydraulic studies, application of these studies and import for other projects, and results of new project design methods....

Fisheries Engineering Program at Washington State University
Problems associated with the interrelationships of instream hydraulic structures, and migratory and resident fish, are in need of better analysis and design. This improvement can be realized...

Reservoir System Management for Hydropower
A study was undertaken to develop a comprehensive reservoir operation simulation model of the Cumberland River Basin, located in the states of Kentucky and Tennessee. Hydropower production...

Artificially Varied Flow: River System Management
Some of the major water quality problems are heat, color, organic sediment, and total dissolved solids. To dilute these and other pollutants, substantial augmentation of flows for water...

LTER and Management of the Upper Mississippi River
The Upper Mississippi River is managed for multiple use by two federal agencies and five states. System management objectives include commercial navigation, commercial fisheries, minimum...

Utilizing a Wetland System for Urban Stormwater Management
The many benefits of utilizing wetland systems as an integral part of an urban stormwater management plan include flood protection (detention), water quality enhancement, and upgrading...

Nebraska's Shrinking Platte River Channel: Biological Aspects and Implications
Since the completion of major water projects along Nebraska's Platte River system in 1941, vegetative encroachment and channel narrowing have substantially altered the central...

Fishways--Historical Assessment of Design Practice
Fishway design has evolved over the years in a conservative fashion. Research has led to the development of some innovative structures, but costs and water usage have been high. Conservative...

Forecasting for Management of Spring Runoff in the Columbia River System
The National Weather Service, Corps of Engineers, and Bonneville Power Administration are affiliated in the 'Columbia River Forecast Service' (CRFS) to more efficiently...

Negotiating a FERC License for the Terror Lake Project
Recently, a long, intense negotiation was completed over the Terror Lake Hydropower project on Kodiak Island in Alaska. The bargaining over the Federal Energy Regulatory Commission (FERC)...

Planning a Resource-Compatible Low Head Waterpower Development
Responsible development of waterpower potential is a significant aspect of comprehensive water resource planning. Recent interest in small scale hydro projects has generated concern among...

Small Scale Hydropower Design Optimization
A method is presented by which the hydraulic design of small hydropower facilities can be economically optimized and then tested for sensitivity to variations in hydrologic prediction....

Walden Hydroelectric Power Project
The Wallkill River at Walden, New York, produced hydroelectric power from 1909 to 1966. Using turbines dating back to the original hydroelectric development, the Walden hydroelectric station...

Camp Far West Hydroelectric Project--From Concept to Reality
The project has progressed through a series of predictable development stages including a detailed feasibility study, major project licensing, an environmental Initial Study and Negative...

Hannibal Hydroelectric Project Ecological Concerns
In January, 1983 the City of New Martinsville, West Virginia filed a license application with the Federal Energy Regulatory Commission (FERC) to construct and operate a 34 MW hydroelectric...

Water Supply Supplemented by Airport Storm Runoff
The quality of natural and induced storm water runoff from Oahu's Honolulu International Airport (HIA) and four outer island airports in Hawaii was evaluated for water supply...

 

 

 

 

Return to search