Influential Factors in Soil Liner Construction for Waste Disposal Facilities
Those factors most influential in the construction of a soil liner to meet a permeability performance standard of 1 multiplied by 10-7 centimeters per second (cm/sec) are identified and...

Automated Permit Review for Hazardous Waste Surface Impoundments
The United States Environmental Protection Agency has proposed to develop automated permit review for RCRA hazardous waste surface impoundment facilities. The review automation will consist...

The Effects of Brine Contamination on the Properties of Fine Grained Soils
Laboratory tests have been performed to investigate the effects of brine contamination on grain size distribution, relative density, liquid and plastic limits, hydraulic conductivity,...

Hydrogeologic Investigations at a Superfund Site in Wisconsin
An estimated 10,000 drums of volatile organic wastes from a nearby manufacturing plant were dumped at a landfill site in southern Wisconsin. Chemicals released from these drums have contaminated...

Hydrocarbon Refining Waste Stabilization for Landfills
Mobile pollutants are generated in a landfill as a function of the waste properties and the response of the deposit to the in-situ stress, climate and biochemical conditions. Release of...

The Typical Engineering Properties of Fly Ash
Knowledge of key physical and engineering properties of coal fly ash is needed in the planning, design, and construction of both disposal and utilization projects. While considerable data...

Evaluation of Waste Disposal Sites Using Geotox
GEOTOX is a knowledge-based expert system designed to assist in the identification and classification of waste disposal sites. Existing methodologies such as formal or qualitative risk...

Water Treatment Plant Sludge as Landfill Liner
Chemical sludge is produced in large quantities during the water treatment processes. The present regulations pertaining to the disposal of solid wastes impose many constraints on any...

Conversion of a Reservoir Into a Landfill Site
The Writer is acting as a geotechnical consultant during the conversion of a disused water reservoir into a landfill site for domestic and industrial refuse. The site developer had no...

Environmental Monitoring and Observations Before and During Excavation of a Landfill in Owatonna, Minnesota
A Minnesota landfill inactive since 1962 was excavated in 1985 to prepare the site for construction of a new waste water treatment plant. The excavation refuse was disposed of in nearby...

Modelling of Contaminant Transport in Clays Via Irreversible Thermodynamics
This study develops a model for the analysis and prediction of contaminant transport in soils using principles of irreversible thermodynamics. The developed model includes five parameters...

Structural Engineering and Microcomputers
This publication contains five papers on the use of microcomputers by structural engineers. The first paper discusses the design of multi-story rigid steel frames. The design process employed...

Effects of Damage and Redundancy on Structural Performance
There are numerous factors involved in the interrelationship between damage states, redundancy, system strength and structural performance. This volume examines some of these factors and...

Detection, Control, and Renovation of Contaminated Ground Water
The papers in this book provide technical guidance to engineers regarding the problems, solutions, and uncertainties associated with groundwater contamination in the United States. The...

Water Jets: Concrete Yes, Tunneling Maybe
High pressure water jets are demolishing concrete from bridge and parking decks, faster and at lower cost than by traditional means. The technique is fast becoming an acceptable option....

The National Incinerator Testing & Evaluation Program
Environment Canada, under the National Incinerator Testing & Evaluation Program (NITEP), is addressing emissions from municipal energy-from-waste combustion systems. The main thrust...

Electronic Gymnastics
Efforts are being made to have all the parties to a project share the same, current information. In order to do so, civil engineering firms are jumping through electronic hoops to get...

Computer Scheduling: On-Line and On-Time
The Intermountain Power Plant, a coal fired, 761 MW coal fired electrica generating facility, has been completed months ahead of schedule and substantially under budget. Project managers...

Worth a Thousand Words
In recent years, microcomputers have grown powerful enough to take over many of the functions that once, only a mainframe could understand. In addition, they have added a few tricks of...

Lawyer on a Microchip
Construction in the 1980s have become a complex, high stakes, intensely competitive business. For architects and engineers involved, the prospect of lawsuits has grown tremendously. An...

 

 

 

 