Initial Operation Model for the Central Arizona Project
A microcomputer program for operating uncompleted portions of the Central Arizona Project has been developed. Engineers may use this program daily to assist in scheduling pumping plant...

Vehicle Sound Power measurement Using the Acoustic Intensity Method
The use of the two microphone Acoustic Intensity Method of obtaining accurate measurement of over-all sound power of large wheel loaders is described. This system is in operation, within...

SRC Elevated Station Structures for New Bullet Trains
SRC Steelframe reinforced concrete structures were utilized on several station buildings for the Japanese National Railways bullet trains. This paper presents an outline of the dimensions...

Modelling Complex Water Distribution Systems
A program previously used for the analysis of hundreds of water distribution systems was successfully modified to provide the features needed for the extended simulation of large complex...

Computerized Design and Selection of Pumping Systems
Three computer models have been applied in the evaluation, design and selection of a high-lift pump station upgrading program developed for the City of Poughkeepsie, New York. The three...

Computer Control of Lift Station Operations
A unique computerized control system to supervise the operation of several lift stations has been designed by Boyle Engineering Corporation (Boyle) and constructed by the City of Orlando,...

Optimization Issues in the Design and Control of Large Space Structures
The optimization and identification issues which arise in the design and control of large flexible space structures are reviewed. The first paper examines the use of several different...

Building in Space
Work on the nation's first permanently manned space station has begun. Almost $200 million in contracts for conceptual design for the station were awarded by the National...

The Tunnel That Transformed Philadelphia
The 1985 Outstanding Civil Engineering Achievement is the Center City Commuter Rail Connection, a 1.7 mile tunnel connecting two former stub-end railroad stations in Philadelphia. The...

Alternative Approaches for Waterhammer Analysis and Pipeline Protection
This paper provides a brief review of typical waterhammer problems and their solutions for pumping systems. Alternative approaches to identify and resolve design problems are discussed....

Designing for Residual Flooding
Flood control projects should incorporate designs and responses for flooding of the protected areas due to exceedance, overtopping, or failure of the features. Design strategies for levees,...

Reliability Evaluation of Water Distribution System Components
Reliability engineering concepts are substantially developed and have been routinely and successfully applied to the evaluation of electrical and mechanical components. However, these...

Economics of Hydrothermal Power Development
The overall performance of a hydrothermal power plant with pumped storage is more cost effective than its competitive counterparts such as oil and gas turbine-generators. The operation...

Portland's New Water Pumping and Hydropower Station
The City of Portland, Oregon, recently placed into service a 100 mgd pumping station as a major milestone in developing a backup and emergency groundwater supply. The facility is also...

Series Finished Water Pumping Facilities
The paper discusses studies and design of series finished water pumping facilities for the Potomac River Water Treatment Facilities. Detailed hydraulic studies were conducted which concluded...

Changing Attitudes Towards Elevated Structures
This paper examines the reaction of professionals and politicians to specific examples of proposals for new public transport systems that entail elevated structures in central areas. When...

Parametric Analysis of APM Operational Components: Stopping Policy, Stations and Headway
This study examines generically relationships among the three parameters using a single line transit system. Optimization models are developed to determine the optimum number of stops...

Station Design Approach to Peoplemover System
This paper examines some of the real issues that face the planners and designers of tomorrow's urban people movers. Concerns such as the urban context of the Miami METROMOVER,...

Station Design for Vancouver ALRT
An overview of the fifteen stations in the first phase of Vancouver's new automated light rail transit system is provided. Decisions related to station locations and types,...

Summary Evaluation of Dade County's APM Foundations
This paper presents an overview of the engineering performance and cost effectiveness of the guideway and station foundations of Dade County's Automated People Mover (APM)....

 

 

 

 

Return to search