Private Owner Expectation of the Resident Engineer
Traditional project goals invariably distill to achieving a high quality project that is on time and within budget. In meeting these goals, todays resident engineers must do far more than...

Does Ethical Engineering Practice Affect Creativity?
Creativity is not reserved for artists, scientists and dreamers! Engineers put creativity into practice every day. Creativity combined with our engineering and management skills accomplishes...

1990: Decade of Natural Disaster Reduction
The loss from natural disasters is extensive. Earthquakes, windstorms, floods, landslides, volcanic eruptions, wildfires, and insect infestations have caused the deaths of nearly three...

A Hazardous Data Explosion
During the 1980s, public concern and government regulations have spawned the huge hazardous waste management industry. But the industry has opened a Pandora's box for site engineers, most...

The New Environmental Requirements of ECPA
The Electric Consumers Protection Act of 1986 ('ECPA') has imposed significant new environmental criteria on the hydroelectric licensing process under Part I...

Independent Consultant's Inspection Reports F.E.R.C. Order No. 122?The First Five Years
On January 21, 1981, the Federal Energy Regulatory Commission (FERC) issued Order No. 122, revising and expanding the periodic inspection program established in 1965 by the Federal Power...

Repair of The Hinckley Dam Embankments
The New York Power Authority was licensed in 1982 to construct and operate a 9 Mw hydroelectric facility at the existing Hinckley Dam near Utica, New York. Soil exploration programs undertaken...

Dam Safety Emergency Action Plans?A TVA-State Responsibility
The Federal Guidelines for Dam Safety requires each dam owner to prepare and maintain emergency action plans (EAP) for each of structure. These plans are necessary (1) to identify problems...

Managing the Jim Falls Hydro Redevelopment Project
This paper addresses two of the water management issues involved in the design and construction of the Jim Falls Hydro Redevelopment Project. These issues include selecting the optimum...

Waterstop Technology?The Next Chapter
Water leakage through and around failed waterstops in concrete structures can cause serious flooding, damage to equipment, affect structural stability, and pose potential safety problems....

Application of Split Roller Bearings in Small Vertical Hydro Turbines
The elimination of lower turbine bearing problems with regard to reliability and water flow contamination was the main concern of this project. A design was needed that would fit the existing...

Influence of Surface Finish on Thrust Bearing Life
The original pivoted pad thrust bearing installed and fitted at the Holtwood Power Station in 1912 by A. Kingsbury has been operating continuously since that time without any difficulty....

Rehabilitation of TVA's Great Falls Project
After seventy-one years of productive service, this two-unit, 31,860 kV plant is undergoing a major rehabilitation. The deterioration of the project has been of concern since the beginning...

After L'Ambiance Plaza
In the aftermath of the tragic collapse of the L'Ambiance Plaza apartment building at Bridgeport, Conn., in April 1987, reforms are being proposed. In 1987 ASCE approved writing...

Highway Factors in Truck Wrecks
An examination is presented of highway factors as they interact with driver and vehicle factors in large truck accident causation. Examples of highway defects are discussed along with...

Effects of Driver Factors and Training on Wrecks
A training program for professional drivers is reviewed. The effects of driver factors, as well as their training, on accidents is presented....

Truck Operating Characteristics in Relation to Safety
For a two-year period large truck crashes on the interstate system in Washington State were investigated using a case-control method. For each large truck involved in a crash, three trucks...

Design Considerations for Trucks in Work Zones
In an Eastern state a 3. 8 mi (6. 2 km) work zone had 14 accidents during a project duration of 120 days. Eleven of the 14 accidents occurred at temporary crossovers where traffic was...

Accommodation of Large Trucks: Traffic Control Issues
The objective of this paper is to identify ways that large trucks can be accommodated safely and efficiently through traffic control. Traffic control is herein defined as encompassing...

Accommodating Larger Trucks at At-Grade Intersections
When a particular intersection serves a high volume of large truck traffic, design considerations should reflect the presence of those larger vehicles. This paper discusses three intersection...

 

 

 

 

Return to search