Lead is a Four-Letter Word
New regulations and strict enforcement make it difficult and expensive to remove lead-laden coatings from steel structures. Lead-based primers and paints are not considered hazardous as...

Pioneer Highway
The 1993 Outstanding Civil Engineering Achievement Award goes to the $490 million I-70 Glenwood Canyon in Colorado. The final link in Interstate 70 from Baltimore, Md. to Cove Fort, Utah,...

Closing the Loop
The 5.1 mi Cooper River Bridge, the longest in South Carolina, completes the I 526 Mark Clark Expressway around Charleston. It is a two-way, four-lane structure with the capability of...

London Linkage
Although it measures just 1.8 km, the Limehouse Link tunnel in London is both a complex engineering project and a gateway to urban renewal. The link is a $350 million highway tunnel connecting...

California Water Issues?Bay-Delta Hearings?Impacts on State Water Project
The State Water Resources Control Board's impending Decision 1630 is described along with its potentially substantial impacts on California's water supplies. Department of Water Resources...

Issues in Balancing Environmental Costs and Benefits in Water Resources Planning
Water projects differ in their physical and economic characteristics and their environmental impacts. Many environmental impacts are addressed through project design and these associated...

Simulation of Rapid Reservoir Drawdown for Flood Control, Cowlitz Falls Project
The Cowlitz Falls Dam is a run-of-river project, currently under construction on the Cowlitz River in Washington State, 23 Km downstream from the town of Randle. The requirements for reservoir...

Economic Costs to the State Water Project of Environmental Protection and Mitigation Measures
The State Water Project stores water in the Sierra Nevada for subsequent diversion from the Bay and Delta for use by millions of Californians. Project construction and operation have caused...

Nonlinear Flow in Embankments
For a large number of water resources projects, the Dupuit-Forchheimer (D-F) assumption is considered a viable design criterion and, consequently, Darcy law is used to determine the locus...

Application of Four Point Model to the Sacramento-San Joaquin Delta
Four Point (Delong et al. 1993) is a finite-difference, one-dimensional, unsteady, open channel, hydrodynamic model. The Modeling Support Branch of the Division of Planning, California...

The DWR Delta Data Assembly Project
While much progress has been made in advancing the theoretical development of estuary models, relatively little effort has been made in improving the quality and quantity of historical...

Yolo Bypass Wetlands?Impact Investigation
Approximately 20 square kilometers of wetland facilities are proposed to be installed within the Yolo Bypass of the Sacramento River Flood Control Project. A hydraulic impact investigation...

Variations Encountered in Design Analysis of Local Scour at Drop Structures
Proper design of drop structures can prevent failure due to scour at upstream structures, like bridges. An important aspect of drop-structure design is the prediction of the local scour...

Development of Enhanced Tools for the Integrated Analysis of Reservoir and Power System Operations
The Tennessee Valley Authority (TVA) and the Electric Power Research Institute (EPRI) have initiated a collaborative project - the INTEGRAL Project - to develop improved tools for coordinating...

Emergent Techniques in Scour Monitoring Devices
This paper presents a brief status report of a research and development project funded by the National Cooperative Highway Research Program (NCHRP) to develop and test scour monitoring...

Bank Stabilization with Environmental Features on the Middle Rio Grande
River maintenance on the middle Rio Grande has changed significantly since channel work began in the mid 1950's. Past practices included pilot or relocation channels, vegetation control,...

Risk and Uncertainty in Flood Damage Reduction Project Design
The recent emphasis on partnership between the Federal government and local sponsors in the development of flood damage reduction projects has promoted considerable interest in the application...

Probability and Impact of an Observed Rare Sequence of Floods
Accordingly, it may be concluded that the severity of the recorded sequence would be exceeded in about 2.1 percent of future sequences, or have about one chance in 45 or 50 of being exceeded...

Sacramento River Environmental Requirements
Environmental requirements have altered bank protection engineering and construction on the Sacramento River, California. Conflicts between public safety and environmental protection remain...

An Evaluation of Fiberglass Pipe Made by Three Different Manufacturing Processes for use in Water Transmission Projects
Fiberglass pipe is made primarily using continuous filament wound process, discontinuous helical filament wound process, and centrifugal cast process. Some 40 countries around the world...

 

 

 

 

Return to search