A Methodology for Risk-Benefit Analysis of Lock-and-Dam Rehabilitation in the U.S. Corps of Engineers
The U. S. Army Corps Engineers operates and manages some 250 locks and dams in major rivers and ports throughout the U. S. At present, many of these structures are thirty-five to forty-five...

RCC: A Dam Rehab Solution Unearthed
Roller compacted concrete (RCC) is fast becoming a popular material for the rehabilitation of existing dams. Several dams have already been rehabilitated using RCC, and several more RCC...

A Study of Exterior Facades?Problems and Solutions
The quality of the exterior facades of a building is important to maintaining aesthetic image, protecting the interior environment from infiltration of heat, cold, moisture, wind, and...

Optimal Design of Sanitary Sewers
Virtually all recent research has been on conventional gravity sewers without pumping. A variety of optimization techniques has been used, including linear programming, nonlinear programming,...

Statistical Analysis of Tellico Dam Piezometer Data
The purpose of this paper is to demonstrate the use of statistical and computer processing methods as a tool for analyzing dam safety piezometric monitoring data. Statistical methods are...

Expert System for Risk Assessment of Concrete Dams
An expert system is presented that will assist a field inspector, during the site investigation of an existing concrete dam, to perform a preliminary structural risk assessment of the...

Practice of Risk Analysis in the Private Sector
Although risk-analysis is currently gaining acceptance in the decision process among engineers involved in public safety of water resources projects, the 'state-of-the-art'...

Grouting a Sand Dam
Hardy Dam, owned by Michigan's Consumers Power Co., was constructed in 1929 by dumping sand from railroad trestles for an embankment to support a concrete core wall. Some...

Complexity in Concrete
Centrust Tower in Miami, Fla., is a $95 million, 37 story, 600,000 sq ft tower rising from one side of a block-square 11 story parking garage. Columns on the curved side of the triangular...

Design of Strontia Springs Arch Dam
The development of the layout and the history of design of the 292 foot (89 m) high Strontia Springs Dam is presented. While a brief description of the general project layout and foundation...

Geology of the Strontia Springs Arch Dam
Precambrian metamorphic gneisses comprised the foundation rock at Strontia Springs Damsite. Geologic exploration at the axis selected for the arch dam revealed a large shear zone which...

Geotechnical Aspects of Strontia Springs Arch Dam
The bedrock at the Strontia Springs damsite consists of generally excellent quality granitic and metamorphic rock, except for a wide shear zone located beneath the dam in the lower valley...

Hydraulic Design of the Strontia Springs Diversion Dam
The hydraulic features which were of primary significance for the project were the diversion tunnel and spillway. The low-level outlet valves and water-supply intake were relatively straight-forward...

Construction of Strontia Springs Dam
Strontia Springs Dam is a principal feature of the Foothills Project on the South Platte River, 25 miles southwest of Denver, Colorado. The dam provides for storage and diversion of water...

Concrete Quality Control and Quality Assurance on Strontia Springs Dam
An essential part of the construction management services provided on Strontia Springs Dam was the quality control of material, mixture proportions, and production for all concrete placed...

Strength-Deformation Properties of Arctic Silt
Hydrocarbon exploration and production activities in the Beaufort Sea require construction of gravity structures capable of withstanding extremely large ice loads at sites where the subsea...

Cyclic Multiaxial Cubical Cell Experiments on a Norton Sound Silt
A servo-controlled multiaxial cubical test apparatus has recently been used to investigate the behavior of the foundation soil for a gravity structure in Norton Sound of the Alaska Outer...

Foundation Response of Arctic Structures to Time-Dependent Ice Loadings
Arctic structures are subjected to a variety of time-dependent loadings, the most important of which are those due to ice. An approach is presented for estimating the strength and deformation...

Dam Pioneers Concrete Variant
The Willow Creek Dam in Oregon is the nation's first dam made entirely of roller compacted concrete. The design and construction of this dam are described and special problems...

Mini Hydro at Low Cost
The Kingsley Dam is an existing irrigation dam that has been retrofitted with electric generating capacity. The project was completed 6 months ahead of schedule without interrupting irrigation...

 

 

 

 