Design Considerations for Wind Loadings
The application of reliability concepts to the treatment of wind loadings on structures has increased in the past several years. Advances have been made in assessing the various uncertainties...
Seismic Probabilistic Risk Assessment for Critical Facilities
Probabilistic Risk Assessment (PRA) for seismic events is currently being performed for nuclear power plants. The background on seismic PRA is presented along with a basic description...
Arctic Foundation Selection: A Decision Matrix
An idealized matrix diagram is presented of the decision making process involved in determing an economic Arctic foundation type that is best suited to the proposed above-grade structure....
Transit Operations Input to Project Planning and Design
The rationale for most public transportation projects is a requirement imposed on the operating agency by an existing or expected service demand. These expected operations may be intended...
Aesthetics of High-Rise Building Structures
The structural aesthetics of high-rise buildings is discussed, with particular emphasis on building frames, individual members and on joints and connections. Examples are given of towers...
Effects of Scale on Tall Buildings
The laws of scale in relation to structures are explored within an historic, as well as an aesthetic context. Particular emphasis is placed on the development of structural systems for...
Aesthetics and Design of Prestressed High-Rise Buildings
This paper will address the aesthetics, economic and construction-related advantages of prestressed concrete for high-rise buildings, with an emphasis on the South-East Asia region. While...
Structural Expression in Tall and Super Tall Buildings
The economic and social pressures that have pushed skyscrapers higher above our cities have also brought forth new structural systems for tall buildings. As this trend is expected to continue...
Quality Assurance/Quality Control; Case Studies?Introduction
The report emphasizes several requirements for quality management: a. The need for a knowledgeable field representative, preferably the resident engineer. This person must be familiar...
Quality in the Constructed Project: A Workshop Report
In the fall of 1984, ASCE conducted a workshop to determine what actions are necessary to improve quality in the constructed project. The engineering segment of the two-day meeting included...
Quality Management in the US Army Corps of Engineers: An Evaluation
Quality management programs are employed to assure the achievement of specific standards of performance. In the construction industry, quality management personnel face common problems...
The Role of the Quality Assurance Management on a Large Commercial Project
The role of the quality assurance manager on a high rise project being built on a tight time schedule is a challenging and diversified assignment. It is made especially difficult when...
Construction Management: Dallas North Tollway Project
This article will attempt to illustrate the importance of flexibility of the design and construction inspection process to insure the project is constructed within the time and budget...
Managing Quality into the Workplace
In February, 1983, the author's organization began a process designed to enhance attitudes about quality in every individual member of the organization. The process requires...
South Branch Rockaway Storm Water Management Study
The Division of Water Resources of the New Jersey Department of Environmental Protection, the Hunterdon Soil Conservation District, the United States Department of Agriculture's...
An Ecosystem Approach to Watershed Management
An example is drawn from the Little River Research Watersheds near Tifton, Georgia. Riparian hardwood forests (low management) and upland agricultural fields (high management) are the...
Crown Corporation Approach to Watershed Management
On July 1, 1984, the Government of Saskatchewan proclaimed the Water Corporation Act. The Act formed the legislative basis for the newly formed Saskatchewan Water Corporation and ushered...
Tools for Managing Army Training Lands
Army land managers and planners are responsible for managing large, diverse parcels of training land for sustained use. The highly variable but often destructive training requires a systematic...
Chaparral Watershed Management: A Systems Approach
The predicted environmental and economic effects of partial chaparral conversion for increased water yield on an experimental watershed in the Prescott National Forest, Arizona, are examined...
Mass. Municipal Watershed Management?Case Study
Most of the estimated 200,000 acres of municipally-owned watershed land in Massachusetts currently suffers from a lack of wise, multiple-use forest management which has resulted in lost...