Social and Environmental Objectives in Water Resources Planning and Management
The nation's goals for water programs and projects must be clearly understood by engineers. This report describes the process of identifying social, economic and environmental...
Managing Finances
Managing finances is becoming increasingly complex for the engineering manager. How the engineering manager assesses the impacts of an individual's attitude can have a pronounced...
Small Computers in Construction
These proceedings are the result of a symposium sponsored by the Task Committee on the Application of Small Computers in Construction of the Construction Division of ASCE. Nine papers...
Tunnelling in Soil and Rock
The relationship between tunnel design and construction is covered with emphasis on case histories of field measurements and performance. A general report emphasizes the importance of...
Emerging Computer Techniques in Stormwater and Flood Management
These proceedings identify and assemble information on recent applications of mini- and microcomputer technology to problems in urban stormwater and flood management. Instrumentation and...
Guidelines for Tunnel Lining Design
These guidelines set forth a program for conceptual and practical orientation in the design of tunnel linings. They are not intended to be used as a code or collection of specifications....
Fast Tracking Milwaukee's Stormwater Cleanup
In building a massive sewer and treatment plant, Milwaukee solved legal and management problems. At the same time, the city speeded design and construction for the project. Triggered by...
Building Failures: Design Problems and Solutions
A Building Failures conference of the Engineering Foundation dissected the problems leading to failures and recommended ways to reduce failures. This article discusses value engineering,...
Help with Permits In One Stop
New Jersey State Government has developed a system which enables practicing engineers to identify and ensure compliance with regulatory requirements for a specific project. Publication...
L.A. Grapples with Changing EPA Regs
Environmental Protection Agency (EPA) studies indicate that between now and the year 2000 an additional $117 billion will be needed to accommodate projected growth and to meet water quality...
Seismic Risk and Decision Analysis of Lifeline Systems
This paper provides general guidelines for performing lifeline seismic risk and decision analyses. Relevant input models are introduced as they support the performance of component and...
Seismic Response of Port and Harbor Facilities
A research program compiled information regarding the behavior of port and harbor facilities during past earthquakes. The potential for significant damage to port and harbor facilities...
Viaduct
This concrete box girder viaduct, an Award of Merit in the 1984 Outstanding Civil Engineering Achievement competition, helps complete a seven mile gap in the Blue Ridge Parkway in North...
Traffic Reroute
During reconstruction of Pittsburgh's Interstate 376, traffic and passenger diversion efforts, more extensive than ever before, were undertaken. Eight percent of the $62 million...
Water Supply
The Foothills Project adds 125 mgd (5.5 m�/s) to the Denver area water treatment capacity, and saved approximately $1 million in energy costs in the first year of its operation. The $163...
Prefab Power
The Love Hydroelectric Generating Station, owned by the city of Vanceburg, Ohio, was prefabricated in France complete with all components, brought across the Atlantic and towed to Greenup...
Dome
Roofed with the worlds largest diameter wood dome at 530 ft., the Tacoma Dome, a multi-purpose sports and convention center has helped revitalize a blighted part of that Washington state...
Sewage Plant
The Sacramento Regional Wastewater Management Program cost $460 million, took 10 years to build, and solved problems in sludge disposal, odor control, conveyance systems, combined sewer...
Flood Control
The Hamilton and Riemer reservoirs were constructed by excavating pits below grade to receive flood overflows from adjacent streams. The two reservoirs are part of a 52 sq. mile (135 km�)...
Treatment of Design and Construction Errors in PRA
The risk estimates developed in a PRA should allow for potential design and construction errors. These errors generally modify the component responses and fragilities. Since most design...
Return to search