Total Cost Purchase Options Buy vs Lease vs Rental Conversion Cash Flow Analysis
Today's financing alternatives are very complex and sometimes difficult to comprehend. The combined effect of the slow economy and uncertain future workload has accelerated...

Alternative Methods for Payment of Construction Equipment Ownership Costs on Federally Funded Projects
Construction equipment investment is a significant portion of the capital investment for contractors specializing in heavy construction. Operating this equipment under the changes clause...

Financial Statement Impact of the Rent/Lease/Buy Decision for Contractors using Heavy Equipment
Contractors with substantial equipment requirements must carefully weigh all of the quantitative and qualitative factors related to how they finance their equipment. Certain of these factors...

Earthwork and Resource Estimation on Large Expedient Projects
A computer-aided technique is being developed for planning, design, estimating, and scheduling of horizontal construction for facilities required to support military operations. This technique...

Teaching Experiment in Real-Time Construction Data Acquisition
This paper describes an experiment used in an undergraduate civil engineering course to familiarize students with interfacing electronic instruments mounted on a construction machine to...

Restoration of Navy LTA (Lighter Than Air) Hangars
In 1942 and 1943 the Government constructed a series of 16 blimp hangars at ten Naval Air Stations along the east coast, west coast and gulf coast. The hangars erected in pairs housed...

Nondestructive Evaluation of Timber Bridge Piles
A nondestructive technique for the determination of the in-place strength of timber bridge piling is presented herein. The testing technique is the ultrasonic wave propagation method in...

Solving Nonlinear Equations on a Hypercube
Certain classes of nonlinear systems of equations, such as polynomial systems have properties that make them particularly amenable to solution on distributed computing systems. Some algorithms,...

Supercomputers and their Impact on Civil Engineering
The increasing complexity of today's civil engineering applications requires increasing detail and analyses with associated increased demands on computer resources. At the...

The Promise of Supercomputers
This paper briefly reviews the classification and general architecture of supercomputers: their capabilities, promise, current and projected limitations are considered. The author reviews...

CAPPS: Custom Architectured Parallel Processing System
CAPPS (Custom Architectured Parallel Processing System) is under development at Paragon Pacific Inc. , Torrance, CA, for the solution of computationally intensive engineering problems....

Guide to Investigation of Structural Failures
Prepared by the Research Council on Performance of Structures of ASCE. This report contains guidelines for conducting an investigation into the causes...

Lessons Learned from Design, Construction, and Performance of Hydraulic Structures
The intent of this publication is to provide lessons learned, both positive and negative, from activities associated with design, construction, and performance of hydraulic structures....

Microtunneling: No Pipe Dream
Microtunneling machines developed in Japan and Germany can help install pipes, ducts and cables without disrupting urban activities at street level. A microtunnel is defined as having...

Approaches to Acceptable Risk
Acceptable risk has numerous meanings, that are derived from its having been defined in multiple arenas and by multiple groups. This paper describes several approaches to the question...

A System Framework for Engineering Risk Analysis
A mathematical system framework is developed to model a series of criteria called performance indices (PI) related to engineering risk in water resources. Such criteria include reliability,...

U.S. Bureau of Reclamation Use of Risk Analysis
The United States Bureau of Reclamation (USBR) has been using risk analysis techniques in assessments for management decisions. Before presenting USBR practice and experience, the paper...

A Methodology for Risk-Benefit Analysis of Lock-and-Dam Rehabilitation in the U.S. Corps of Engineers
The U. S. Army Corps Engineers operates and manages some 250 locks and dams in major rivers and ports throughout the U. S. At present, many of these structures are thirty-five to forty-five...

Microcomputer Application of the Florida Standard Urban Transportation Modeling Structure
Over the past five years the Florida Department of Transportation (FDOT), in conjunction with the twenty-one Florida Metropolitan Planning Organizations, has developed the Florida Standard...

The Ultimate High Tide
Unprecedented consumption of fossil fuels and clearing of vegetation have spurred interest in the greenhouse effect. Under this scenario, a build-up of carbon dioxide and other gases in...

 

 

 

 