Construction Approach to Denver International Airport
The new Denver International Airport, a $2.7 billion project, is being designed and constructed under the oversight and guidance of a Program Management Team (PMT) led by the City and...

Denver International Airport Fabric Roof Design
The design of Denver's Landside Terminal Complex for the new Denver International Airport, called for some far reaching vision coupled with imaginative building technologies. Because of...

The Design of the Airside Concourses
The growth of commercial air traffic in the United States has resulted in the development of the 'New Denver International Airport.' the airside concourses were designed by joint venture...

The Airport Traffic Control Tower for the New Denver International Airport
Developing a new airport traffic control tower involves many complexities of planning, engineering, and coordination. For the ATCT at the New Denver International Airport, these complexities...

Colgate Palmolive Transportation Impact Case Study
The Colgate Palmolive Company owns eleven city blocks of land in the Exchange Place area of downtown Jersey City, New Jersey. Colgate Palmolive operated manufacturing facilities on their...

Microbiologically Induced Corrosion
Researchers investigating a building whose columns bled a colorless liquid found that the building was under attack by microorganisms. A community of bacteria had contaminated the fireproofing...

Sydney Airport International Terminal Development
The existing International Terminal at Sydney (Kingsford Smith) Airport-KSA-is overcrowded and providing a low level of service. Planning for an expanded facility catering for KSA needs...

Green Architecture: Designing an Ecologically Sound Dwelling
Green architecture has evolved in many places with various names such as natural, healthy, ecological, organic, biological, harmonic, sacred, holistic, etc. The general focus of Modern...

The Future Role of Factory Built Housing
For most of this century, and particularly around 1970 as epitomized by Operation Breakthrough, the concept of transitioning the US housing industry from stick-by-stick field building...

Customer Requirements in Industrialized Housing
Residential construction efforts in the U.S. are highly fragmented, and this has slowed the application of new technologies. While there has been an increase in the use of manufactured...

Computer Modeling of Structural Systems for Residential Scale Buildings
The majority of housing in the United States is single family residences or low-rise multiple family dwelling units. The structural systems usually consist of rather uncomplicated types...

Housing?Economic Standard
House project with simplistic spatial concept (integrated system) in order to facilitate construction and further expansions with the same architectural design. The design allows for the...

Performance Specifications for the Design and Manufacture of Energy Efficient Housing in the 21st Century
This paper reports on work in progress in `Design for Energy Efficiency', one of fifteen task areas of the U.S. Department of Energy sponsored Energy Efficient Industrialized Housing research...

Implementing Uncertainty Treatment in AI Development Environment
The seismic vulnerability of existing masonry buildings is investigated by an expert system prototype. Field inspectors have to provide answers which can be of a Boolean, fuzzy or probabilistic...

Reliability-Based Specification for Engineered Wood Construction
A three-year, industry-sponsored effort has resulted in the development of a reliability-based, load and resistance factor design (LRFD) Specification for wood construction. Improvements...

International Harmonization of Reliability-Based Timber Engineering Design Codes
An overview is presented on reliability-based timber design code activities in various major timber producing and consuming countries. The overview is based on information generated through...

Offshore Pile System Reliability
The existing design methodology for offshore pile foundations is evaluated relative to the ultimate performance of the foundation system using reliability techniques and data from three...

Comparison of Wind Cross-Spectral Data with Models
Existing analysis procedures for the prediction of long-span bridge response to wind have until recently neglected the horizontal-vertical cross-spectral components of the wind under the...

Construction Loads on Floors: Results of a Survey
A survey of post-shorting construction loads on floors of multi-storey buildings is described. The estimated parameters of a probabilistic model of the peak (transient) loads are reported....

A Two-Stage Safety Assessment Methodology for Construction Activities
The control of construction activities requires the evaluation of the condition of the control attributes of interest. In order to develop the required methodology, a model of the construction...

 

 

 

 

Return to search