Financing Hydro Projects
STS Consultants, Ltd. is a consulting engineering firm with expertise in the Hydraulics/Hydrology area. Boulevard Bank is a major commercial bank in Chicago, Illinois. This paper elaborates...
Development of the Standardized Francis Turbine
Initial machine selections to address higher head sites included small custom Francis turbines and standard pumps running in the turbine mode. As the former proved too costly and the latter...
Computer Aided Design of Small Hydro Turbine
The paper discusses a system for producing custom designed turbines which are attractive in price and delivery, retaining the advantages of customization. A computerized program is being...
Hoover Dam Plus Fifty Years Equals El Cajon Dam
The completion of El Cajon arch dam on the fiftieth anniversary of the completion of Hoover Dam has given the opportunity to compare design and construction of two concrete arch dams constructed...
Hoover Dam Earthquakes Reconsidered
In 1936 and 1937 as the water rose behind Hoover Dam, earthquakes were felt in the Boulder City area and as far away as Las Vegas. Interest in induced seismicity was renewed in 1967 with...
Three-Dimensional Plotting in Dam Potentials
Hydroelectric development is important to many basins in the western United States. Topographical studies are normally used to arrive at sites to be chosen for further investigation of...
Ground Temperature Monitoring Cominco's Red Dog Project
Procedures are available in the literature for estimating subsurface thermal characteristics of foundation soils in cold regions using published climatic characteristics for a given area....
Massive Ice Detection by Earth Resistivity
This paper presents two case histories utilizing remote sensing earth resistivity equipment to target subsurface massive ice locations. In one case, a number of probe locations were made...
Coal Mining in Alaska's Interior: Problems and Solutions
The Usibelli Coal Mine located in Healy, Alaska is currently the largest operating coal mine in the state of Alaska. The mine has recently increased production to nearly 1. 7 million tons...
Geotechnical investigation: Cominco's Red Dog Mine Facilities
The siting of major facilities associated with development of the Red Dog Mine Complex in Northwestern Alaska on relatively warm permafrost soil and rock presented geotechnical engineers...
Design and Construction of the Spirit Lake Outlet Tunnel, Mount St. Helens, Washington
In 1982, a governmental task force was formed to evaluate the hazard posed by the blockage of Spirit Lake that resulted from the eruption of Mount St. Helens in May 1980. An analysis was...
Engineering Implications of Impoundment of the Indus River by an Earthquake-Induced Landslide
Historical records and physical evidence indicate that in the Himalayas of northern Pakistan a huge landslide dam was caused by an earthquake in 1840. The dam blocked the Indus River,...
An Expert System for Inactive Hazardous Waste Site Characterization
The area of hazardous waste management is a broad and multidisciplinary field requiring expertise in engineering, geology, chemistry and toxicology, and is an ideal area for the application...
An Expert System for Site Selection
Site selection involves two phases. First, a small number of alternatives among all possible sites are identified for further evaluation, and then the selected alternatives are examined...
Applications of Automated Interpretation to Sensor Data
This paper focuses on potential applications of the AISD. (A knowledge-based concept for automating the interpretation of sensor data) concept in civil engineering. A number of potential...
A Salt Solution for Nuclear Wastes
The Department of Energy's Waste Isolation Pilot Plant in Southeastern New Mexico is the nation's first full-scale facility for disposing of radioactive waste...
Overcoming Opposition
During a zone change hearing in connection with site selection for a new landfill near Coeur d'Alene, Idaho, some honest communication overcame opposition by the residents....
Treatment in Your Own Backyard
Everyone wants the nation's hazardous waste sites cleaned up, but nobody wants the wastes disposed of near them. Therefore, cleaning up these problems at the site may be the...
Risk Assessment: Engineering Tool
In factoring in human-health impacts when tackling an environmental problem, risk assessment is often the best approach. Its use is growing fast. The technique increasingly is being used...
Design of Wharf Facilities, Guam, M.I., to Accommodate Difficult Site Conditions
A wharf facility currently under construction in Guam, Mariana Islands, for the U. S. Navy utilizes precast concrete box caisson construction to satisfy difficult site conditions. To reduce...