Tunnel Takes Cathodic Protection
Cathodic protection is nothing new for bridges and parking garages, but it has never been installed in a tunnel�until now. As part of a $15 million rehabilitation project, the method is...
Earthquakes: A New Look at Cracked Masonry
Economics, fears of liability, and a strict damaged-buildings repairs ordinance have contributed to an extensive delay in the repair of masonry-infill buildings in earthquake-stricken...
Tying Back a Landslide
A slope covered with landslide debris is never the most desirable site on which to build, but sometimes it is the only one available. For the Forks of Butte hydroelectric power project,...
The Caisson Solution
Detroit is expanding its wastewater treatment plant to drastically reduce combined sewer overflows. The expansion, however, is being done on an extremely congested 4 acre tract of land...
Mining for Building Expansion
Engineers adapted mining techniques to tunnel under a vibration sensitive manufacturing operation to create new working space below. IBM workers needed more working space at their Vermont...
Cables and Anchorages
The following types of cables are generally used in cable stayed bridges: Parallel bars; Parallel seven wire strands; Parallel or semi-parallel wire cables; Locked coil strands and ropes;...
Under the Undersea World
Soil conditions in New Orleans are generally unfavorable to the construction of large structures, and exceptionally so along the Mississippi River banks, which tend to slide. But that...
Dome Over Orlando
The article describes Orlando's new City Hall, a 267,000 sq ft nine-story reinforced concrete tower, clad in granite-aggregate precast concrete panels and topped by a 120...
Sending Steel Down the River
Completed last October 1990, the Roosevelt Lake Bridge is now the longest two-lane, single span, steel-arch bridge in North America, spanning 1,080 ft. Also, the longest steel arch bridge...
Experimental Study of Adfreeze Heaving of Augered Caisson Footings
In order to establish the required depth of augered caisson-type footings in cold regions and their optimal design against adfreeze heaving, an experimental field investigation has been...
White Steel for Osaka Bay
Wind, earthquake and aesthetics were the design determinations for Japan's Higashi-Kobe Bridge. The designers also had to consider the man-made bay infill site and a directive...
Earth Walls: Making the Right Choice
Earth walls are retaining walls where the ground assumes a load-bearing role. These walls either support compacted earth (embankment-type reinforced compacted earth walls such as Doublewal...
New Support for Pin-Hanger Bridges
To promote safety of their bridges, many state highway departments are considering ways to add auxiliary support to existing pin-hanger bridges. The Pennsylvania DOT and its open-end consultant...
Designing for Corrosion Control
This presentation will discuss designing from several aspects: a. Designing of the item to lessen the affects of corrosion. b. Selection of non-corrosive materials in the designing process...
Recirculation Piping Replacement Project at Dresden Unit 3
This paper discusses the Recirculation Piping Replacement Project performed at Dresden Unit 3 during 1985 and 1986. It describes several of the technical and administrative problems associated...
A Computerized Completion
The original designers of the 1.6 million sq ft Fillmore Center in San Francisco (its largest mixed-use development project in 20 years) had specified a large amount of steel reinforcement...
Simplified Second-Order Inelastic Analysis for Steel Frame Design
Several current approaches are outlined that account for the spreading of plasticity in a second-order inelastic analysis of frames. The approaches are based on modifications to the simple...
Verification of Approximate Methods of Structural Analysis
Sophisticated computer programs for the determination of the effects of instability on the inelastic stress resultants in steel structures will appear to be 'black boxes'...
Certifying the TN-BRP and TN-REG Transportable Storage Demonstration Casks
The U.S. Department of Energy (DOE) has obtained U.S. Nuclear Regulatory Commission (NRC) certification to transport two transportable storage casks for a demonstration project. Because...
Effect of HNO3-Cerium(IV) Decontamination on Stainless Steel Canister Materials
Stainless steel canisters will be filled with vitrified radioactive waste at the West Valley Demonstration Project (WVDP), West Valley, NY. After they are filled, the sealed canisters...
Return to search