Effects of High Sediment Concentrations on Velocity and Sediment Distributions
Several classifications are required to describe sediment-transporting flow. The flow may be turbulent or laminar, Newtonian or non-Newtonian, and may also have a uniform or nonuniform...
Coping with High and Low Pressures of Transient Flow
Conditions exist in most long distance water pipelines, such that abnormal but inevitable occurrences will cause transient flow. Often the most crucial conditions for consideration by...
Milwaukee Sewerage District Interplant Pipeline
The pipeline is intended to transfer solids between the Jones Island and South Shore treatment works a distance of approximately 12 miles (19. 3 km). The 4 conduit pipeline comprising...
Riprap Sizing-Four Methods
A comparison summary is provided for sizing of riprap by four methods: Isbash, Froude, Tractive Force - Logarithmic Velocity Profile (TFL), and Tractive Force - Power Velocity Profile...
Cavitation in Various Types of Shear Flow
Cavitation in turbulent shear flow depends on the intensity and spectral characteristics of the pressure fluctuations in a Lagrangian frame of reference as well as depending on the concentration...
Prediction of Dam Overtopping Due to Mudflows
The eruption of Mount St. Helens on May 18, 1980 resulted in a small mudflow into Swift reservoir, which is located immediately south of the mountain. An engineering/geologic study was...
Modeling of a Multifunctional Hydraulic Structure
A 1:12 scale Froude model of a hydraulic control structure in the Rochester Combined Sewer Overflow Abatement Program (RCSOAP) was constructed and tested to optimize the design requirements...
Optimal Real-Time Operation of a Cascade of Hydropower Plants in Central West China
The Longxihe River hydropower system consists of four hydropower plants in series. The four reservoirs are used for flood control and power generation. Among the four reservoirs, only...
Artificially Varied Flow: River System Management
Some of the major water quality problems are heat, color, organic sediment, and total dissolved solids. To dilute these and other pollutants, substantial augmentation of flows for water...
Power from a Water Supply System: A Resource Which Can Be Tapped
There are numerous water supply systems from which hydroelectric power could be developed without impending the regular operational schedule. The basic principle of operation is not different...
Sensitivity of Model Choice in Reservoir Design
The Box-Jenkins method of model construction and tests of model adequacy and fit are applied to a reservoir design problem. The sensitivity of the stochastic models used to generate synthetic...
Modeling Pool and Riffle Sequences in Alluvial Channels
A one-dimensional mathematical model has been developed to predict the hydraulic characteristics of alluvial channels under low flow conditions. For a given steady discharge, channel geometry,...
Design and Operation of Pipeline Control Systems
More and more of the time of the engineer involved in the design and construction of a pipeline project is devoted to problems relating to the control systems to operate and monitor the...
The Third Wave in Water Quality Management
In the 1970's there was great pressure to clean up water-polluting discharges no matter what the cost. Now in the tight-budget 1980s, there is a vigorous search for more cost-effective...
Measurement of Ice Forces on Structures
Methodologies and techniques are discussed for measuring ice forces on fixed structures situated in rivers and lakes. The usual method of measuring ice forces is to place a load frame...
San Francisco Convention Center Goes Underground
The Moscone Convention Center, built at a construction cost of �126 million, opened its doors to an admiring public on December 2, 1981. The Center's grand exhibit hall, 90...
Underground Plastic Pipe
Thirty-nine of the papers presented at the 1981 International Conference on Underground Plastic Pipe are included. The types of pipes examined include: thermoplastics, thermosetting plastic...
Dike Safety Upgraded with Millions of Square Feet of Fabric
Nonwoven fabrics of two different weights were used in an $80 million dike reconstruction project in southern Florida. Florida Power & Light Company rebuilt the embankment to a...
Japanese Tunnel Design: Lessons for the U.S.
The Japanese construction industry has a great deal to offer regarding designs, methods, and procedures that can efficiently overcome the tough physical and environmental constraints encountered...
The Deep-Shaft Process: Bright Future for Treating High-Strength Wastewaters
A Deep-Shaft wastewater treatment process may reduce by 10 to 30 percent the power requirements and land area needed for a plant. The technique is most attractive for treating high-BOD...