Ecological and Biological Considerations in River Restoration
When planning river restoration projects, proper consideration must be given to the target resources of concern. This should include provisions to meet the physical, hydraulic, and biological...

Role of Vegetation in Hydraulics of Channel Restoration
Boundary layer theory is used to develop a backwater model for flows through vegetated waterways which can be employed to approximately estimate flow depth variation in channel restoration...

Anaheim State-of-the-Art Water Treatment Plant?Six Years from Conception to Completion
After six years of intensive planning, budgeting, pilot testing, design, and construction, the City of Anaheim, California, has successfully completed the modifications to the 15 mgd Lenain...

ASR Case Study?City of Salem, Oregon
The City of Salem, Oregon is developing an Aquifer Storage and Recovery (ASR) system to provide a 20 mgd capacity, 440 mg volume, emergency storage and peak day supplementary supply. When...

Subcatchment Parameterization for Runoff Modeling Using Digital Elevation Models
Numerical algorithms are presented to estimate the length, width and slope of rectangular planes representing irregularly shaped overland contributing areas defined on raster Digital Elevation...

Engineering Education for Appropriate Technology
Few appropriate technology programs offer an engineering-based curriculum. The Drexel University program is rare in that it combines a solid engineering degree with a broad-based supplement...

Education and Research Needs for Appropriate Technology
Appropriate technology and sustainable development are inextricably interrelated and the engineering profession is increasingly realizing that greater care must be given to taking these...

Economic Risk Analysis as a Research Directing Paradigm
Risk analysis could be used to direct a manageable, prioritized strategic plan for evaluating bridge scour research needs. Through risk analysis, the costs of research and the potential...

San Diego County Water Authority's Emergency Storage Project: A Major Planning Achievement
The San Diego County Water Authority (Authority) has been actively working to maximize the security of the future water needs of the community it serves. The Emergency Storage Project...

Selection of Sediment Transport Relations: Part I, Review of Sediment Transport Comparisons
There are a great number of sediment transport relations in existence in the world today. The engineer is often faced with the problem of choosing the most appropriate relation for the...

Selection of Sediment Transport Relations: Part II, Ranges of Dimensionless Numbers
With a large number of sediment transport equations claiming to be applicable within various ranges of hydraulic and sediment parameters, engineers are often faced with the dilemma of...

Construction of Performance Contours on the Storage-Yield Plane of a Within-Year Reservoir System
The reservoir storage-reliability-yield (S-R-Y) relationships developed in the past have considered only the probability of failure to meet the target requirements, but not the likely...

The Analysis of the Failure of the Minte Stream Culvert
A persistent and continuous rainfall that lasted for more than 30 hours on May 6?7, 1995, caused the sudden failure of an embank ment on the main road between Puerto Varas and Ensenada,...

Protection against Flooding: A New Delta Plan in the Netherlands
The Netherlands are situated on the delta of three of Europe's main rivers: the Rhine, the Meuse, and the Scheldt. As a result, the country has been able to develop into an important industrial...

Measurements of Bridge-Scour Depths in Mississippi
This paper briefly summarizes 190 measured pier-scour depths collected dur ing 1942?94 at 22 selected bridges in Mississippi and presents an envelope-curve equation for the data. The envelope-curve...

Scour-Hole Dimensions at Selected Bridge Piers in New York
Knowledge of scour-hole dimensions can be used by bridge engineers to deter mine the extent of countermeasures needed to prevent scour at bridge piers. Scour-hole widths at 128 piers,...

Controlling the Impacts of Development on Storm Water Quality through Proper Site Planning and Design
Land development and construction activities can significantly alter drainage patterns, increase runoff peak flow and volume, and contribute pollutants to storm water runoff. Federal and...

Appropriate Technology for Sustainable Development
The inventiveness of the 20th century is forcing engineers (and others) to look at the multitude of technology options available, to develop criteria and methods for evaluating each option?and...

Use of Geomorphic Data for Assessing Stream Stability at Bridge Structures
The authors recently completed a statewide bridge scour evaluation for the Nevada Department of Transportation, which included evaluation of the geomorphic processes of bank erosion and...

Professional Associations Offer Design Resources for Civil Engineers
A civil engineer is trained academically and professionally to meet the challenges and solve the problems of ever expanding world populations. With an increased demand for civil engineers...

 

 

 

 

Return to search