A Systematic Human Factors Assessment of a Department of Energy Facility
This paper presents the methodology for conducting a systematic human factors assessment of the as-built configuration of buildings at the Rocky Flats Plant (RFP). In support of this effort,...

Mangling the Models: Real-Life Experiences in Voluntary Siting
Social scientists are accumulating a growing body of research to guide the development of communications models for siting controversial facilities. The models developed by our social...

Safety Envelope Input: Nuclear Facility Isotopic Content (NFIC) Management System
The Westinghouse Savannah River Company (WSRC) is aggressively applying environmental remediation and radioactive waste management activities at the U. S. Department of Energy's (DOE)...

Heat Transfer in Vertical Concentric Cylinders in a High Level Nuclear Waste Repository
Modeling free convection heat transfer in an cylindrical annular enclosure is still an active area of research and an important problem to be addressed in the high level nuclear waste...

Fear of Permanence: The Challenge of Siting Interim Facilities
This paper examines an increasingly urgent and surprisingly difficult task: siting potentially hazardous facilities that are intended to operate for a limited period, such as a Monitored...

Snake River Salmon Recovery Plan Development
The process used by the Snake River Salmon Recovery Team to develop its recovery plan is described. Major conditions affecting fish survival are identified. The Team's approach to evaluate...

Object-oriented River System Simulation
This paper describes an object-oriented approach to river basin simulation modeling that is event driven rather than time driven as in most river system simulation models. At the heart...

Collection System Inspection and Rehabilitation Program
The Metropolitan Water Reclamation District of Greater Chicago is a regional wastewater and water resources agency responsible for serving an area of about 875 square miles. Recently the...

Estimating Maintenance Cost of Existing Stormwater Retention Ponds
The 280-acre Kensington Business Park includes 11 stormwater retention ponds that were also designed to provide aesthetic enhancement. Maintenance of these ponds became a concern when...

Residential Water Conservation and Reuse Demonstration: Casa Del Agua and Desert House
Occupied single-family homes can provide factual data as well as create an active real-world setting for education of the public. The installation of water-efficient fixtures, rainwater...

Dynamic Analysis and Design Considerations for High-Level Nuclear Waste Repositories
This proceedings, Dynamic Analysis and Design Considerations for High-Level Nuclear Waste Repositories, consists of papers presented at the...

NOISE?A Comprehensive Software Library for Highway Noise Analysis
The Noise Software Library is a collection of highway noise analysis software tools that are arranged together under a powerful file management system which provides a transparent method...

Designing in Three Dimensions for Manufacturing Facilities
Du Pont Engineering is using Three-Dimensional Design for the design of our manufacturing facilities. Our 3D design system was used on several projects in 1992, and full implementation...

Knowledge and Information Processing with Drawing Objects in Construction Phase
Knowledge processing by CAD systems poses challenging problems for the efficient integration of design and construction processes. While CAD systems have been applied to various phases...

Finite Element Analysis and Design of Bridges with Applicatrons of ICAD
This paper describes applications of client-server models, interprocess communications (IPC), and concepts of intelligent CAD (ICAD) to the interactive design and analysis of highway bridge...

3D Template of Human Figure for CG Animation in Design
It has become commonplace to use computer graphics (CG) animation in architectural and landscape design. Historically, CG animation has been employed primarily as one of many presentation...

Computer-Aided Decision Model for Selecting a Contractual System
An owner of a construction project often faces the problem of selecting a contractual arrangement. The process of selecting a contractual system depends on the owner's preferred risk sharing...

Integrated Resident Management Support
Lack of a common data standard among all construction field offices has added cost to overall U.S. Army Corps of Engineers automation efforts. The creation of a common resident office...

ICPS: Integrated Construction Planning System by Object-Oriented Planning Models
Knowledge processing for integrated building system planning and construction system planning poses challenging problems to integrate design and construction process efficiently. While...

The Design Navigator
A building design system has no bridge the gap between the complexity of the design information, resulting from the artifact itself, the large amount of laws, regulations, and restrictions,...

 

 

 

 

Return to search